City of Monrovia Seal

Canyon Park|Monrovia, California|60 GPM - 17.7' TDH

jweddell50gpm - 100gpm, Booster Pump, Booster Pump Station, Booster Stations, Pacific, Wastewater

The Canyon Park lift station and booster skid project represents a successful partnership between Romtec Utilities, the City of Monrovia, and Merrell Johnson Engineering. By delivering a fully engineered, prefabricated system, Romtec Utilities helped the city modernize its wastewater infrastructure with minimal disruption and maximum reliability.

army post wastewater

Ketchikan Back Island|Ketchikan, Alaska|51.1 GPM - 46' TDH

jweddell50gpm - 100gpm, Military Installations, Wastewater

Romtec Utilities was selected to design and supply a complete packaged Buy America wastewater lift station for a U.S. Army Corps of Engineers (USACE) project located on Back Island near Ketchikan, Alaska. The lift station supports public works improvements for a nearby military installation, reinforcing wastewater infrastructure in a remote and challenging coastal environment.

Utica East Ohio Midstream LNG Plant|Kensington, OH|75 GPM - 67' TDH

jweddell50gpm - 100gpm, Eastern, Oil & Gas, Oil/Water Separators, Stormwater, Stormwater Runoff

Utica East Ohio Midstream needed two new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, these pump stations were designed with double-wall fiberglass wet wells with interstitial leak detection. Both pumping systems included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and different impellers were specified for each of the two pump stations meet slightly differing head requirements.

San Andreas Sanitary District California

San Andreas Sanitary District | San Andreas, CA | 75 GPM - 28' TDH

jweddell50gpm - 100gpm, Pacific, Schools, Wastewater

A new school needed this package lift station to pump stored wastewater every 24 hours. The sump was oversized by design to hold in excess of 5,000 gallons of sewage that would be pumped out at specified medium pumping rate to a low-level shutoff float control. The submersible solids handling pumps in a duplex configuration are accessible by a crane installed on the top slab. An outdoor UL listed control panel is tied-in to an onsite generator for backup power and utilizes an autodialer for communications.