Kings Mountain Energy Center, HRSG Pump System

Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH

jweddell300gpm - 500gpm, 500gpm - 1,000gpm, Corrosive/ Caustic Pumping, Eastern, High Temperatures, High/Low pH, HRSG Blowdown, HRSG Pumping, Industrial, Industrial Water, Power Generation, Process Water

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Kings Mountain Energy Center, HRSG Pump System

Middletown Energy Center|Middletown, OH|40 GPM - 25' TDH

jweddell5gpm - 50gpm, Corrosive/ Caustic Pumping, Eastern, High Temperatures, High/Low pH, HRSG Blowdown, HRSG Pumping, Industrial, Industrial Water, Power Generation, Process Water

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Project Site of the Lakehurst Naval Air Station Wastewater Lift Station

Lakehurst Naval Air Station|Trenton, NJ|250 GPM - 24.77' TDH

jweddell100gpm - 300gpm, Bid Packages, Eastern, Featured Projects, Military Installations, Municipal Collection, Sewer System Expansion, Tech Info, Wastewater

This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage. A UL listed control panel was designed and manufactured in a NEMA 4 enclosure for outdoor operation. Nolta floats were used for the in-well liquid level sensing. The below-grade structural components were designed and supplied precast concrete vaults painted with a marine epoxy exterior coating to prevent moisture incursion.