The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Orange County Water District|Anaheim, CA|30 GPM - 30.0' TDH
The Orange County Water District needed to replace a wastewater lift station for the Burris Basin Pump Station in Anaheim, California. Burris Basin is a large groundwater pump station, pumping clean groundwater to 19 water districts in Southern California.
City of Bakersfield | Bakersfield, CA | 825 GPM - 26.1' TDH
A residential neighborhood in Bakersfield, California needed to upgrade an existing Romtec Utilities lift station to keep up with increasing sewer flows. To meet the higher flow requirements, Romtec Utilities upgraded the existing 7.5 hp pumps to 12 HP Flygt submersible pumps in a duplex configuration.
Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH
The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.