McMinnville, Oregon Apartment Complex Wastewater Lift Station
McMinnville, Oregon Apartment Complex Wastewater Lift Station Apartment Complex Wastewater Lift Station Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This apartment complex wastewater lift station project was for a new development in McMinnville, Oregon consisting of a 138-unit complex. The Norton Landing Apartments feature seven buildings and open spaces for residents. K&E Excavating, who we have worked with on several projects before, contacted Romtec Utilities to design the lift station on behalf of ...
Visalia, California Logistics Wastewater Lift Station
50 GPM
35′ TDH
Visalia, California Logistics Wastewater Lift Station Logistics Facility Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This logistics facility wastewater lift station in Visalia, California services a development by CapRock Partners. We worked with Caprock before on their HLA6 logistics facility, and they followed up directly with us after the completion of that project to get the design on this lift station started. This project is for a logistics building sewer lift station ...
Ontario, California Now and Future Pump System
100 GPM
24.5′ TDH
Ontario, California Now and Future Pump System Now and Future Pump System Design DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This project was unique because it is a now and future pump system for the Inland Empire in California. Romtec Utilities designed the system with the potential to add larger pumps in the future depending on the expansion of the sewer system in that area. It is an intelligent strategy for long-term growth to engineer a system ...
Old Highway 99 N | Roseburg, OR
Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.
The Line at Santa Ana|Santa Ana, CA | 720, 600 GPM - 31', 21' TDH
The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.