Santa Barbara County needed to retrofit an existing lift station site to effectively replace a failing system. The lift station retrofit needed to handle medium flows of municipal sewer from two inlet lines and make use of limited site space.
City of Ashland|Ashland, OR|156 GPM - 55.7' TDH
Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.
Ski Resort Retrofit|Stevens Pass, WA|65 GPM - 35' TDH
Romtec Utilities designed and supplied this wastewater lift station retrofit to meet the medium sewage flows at the Steven’s Pass Ski Resort. A major part of the retrofit supply package were two Vaughan submersible chopper pumps for wastewater. The electrical controls were the next significant portion of the retrofit. The PLC controller included a touchscreen HMI with autodialer telemetry and SCADA options to communicate with the resort treatment plant. This communication provides advance notification for the treatment plant as the lift station is nearly inaccessible during winter months.
Union Pacific Railroad|Cheyenne, WY|4,000 GPM - 25' TDH
The Union Pacific Depot in Cheyenne, Wyoming needed two new stormwater pump stations to replace existing systems. The first station used Ebara 25 hp submersible pumps in a triplex configuration to handle stormwater runoff from a parking lot and additional drains. The second station used Ebara 7.5 hp submersible pumps in a duplex configuration to pump stormwater that drains from the pit of a railway turntable. Both systems include precast concrete valve vaults. Each vault was preassembled with Val-Matic Cam-Centric® plug valves, Val-Matic Swing-Flex® check valves, and Ashcroft pressure gauges. Both stormwater systems discharge into an evaporation pond that was installed as a part of this larger water collection replacement, which also included three additional Romtec Utilities wastewater lift stations.