1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH

Hannah Duncan100-Year Storm, 100gpm - 300gpm, Commercial Development Stormwater, Flood Control, Groundwater Reclamation, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Water Reuse

NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.

Orange County Water District

Santa Ana Delhi | Orange County, CA

Hannah Duncan1,000gpm - 5,000gpm, 100-Year Storm, Collection Systems, First Flush, Flood Control, Pacific, Stormwater, Stormwater Collection, Stormwater Runoff, Treatment Plants, Wastewater, Water Reuse

This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.

Trans Bay Cable

Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH

jweddell100-Year Storm, 500gpm - 1,000gpm, Collection Systems, Industrial, Industrial Process Water featured, Industrial Water, Pacific, Process Water, Stormwater, Stormwater Collection, Stormwater Featured, Transportation

Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.

Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH

jweddell5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Mixed Use, Mixed Use Development, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.

PSEG

Public Service Enterprise Group|Trenton, NJ| 225 GPM - 11.7' TDH

jweddell100gpm - 300gpm, Detention Pond Pumping, Detention Ponds, Eastern, Industrial, Power Generation, Stormwater, Stormwater Collection, Stormwater Runoff

Romtec Utilities was contacted to design and supply a stormwater pump station as part of an improvement project at an industrial power switch station in Trenton, New Jersey. This is one of several locations where aging infrastructure is being replaced by the local electric company, Public Service Enterprise Group, or PSE&G.