This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing. Ebara submersible sewage pumps in a duplex configuration provide redundant pumping capabilities suitable for the medium head conditions. This lift station also includes a bioxide odor control system in the design. A UL listed control panel provides the complete electrical controls with an autodialer for communications.
Kelso Village | Kelso, WA | 308 GPM - 112' TDH
A new development for a commercial park needed this wastewater lift station to connect the development to the municipal sewer system. Submersible centrifugal pumps in a duplex configuration were engineered to meet the medium flow high head conditions of the force main. This system needs to pump at a predefined flow rate in order to achieve the minimum force to reach the existing municipal sewer lines. The lift station control panel is a UL listed panel with redundant float controls wired for intrinsically safe use.
Eagle Park Acres|Madison County, IL|123 GPM - 21' TDH
A large neighborhood received these two lift stations that were designed to handle medium sewage flow requirements. The submersible solids-handling pumps in duplex configurations were specified to handle influent from three inlet lines from different sections of the neighborhood. The below-grade valve assemblies hold the system operation valves, bypass pumping ports, and shut-off valves. The outdoor UL listed control panels utilize pressure transducers and redundant float controls for liquid level-sensing; basic alarms were included for communications.
King Sooper?s Marketplace|Fort Collins, CO|150 GPM - 6.8' TDH
The food & drug store serving a nearby university needed this replacement package wastewater lift station for medium flow rates. Submersible solids handling pumps are designed to operate with suspended grease in the water from a cafeteria in the market. The lift station valves are vertically integrated into the sump discharge piping. An indoor UL listed control panel contains an intrinsically safe barrier for the in-well electrical controls, and an autodialer and basic alarm fulfill communication requirements. Floats are the primary and backup level-sensing control devices.
Tish Non Village|Eureka, CA|70 GPM - 21.6' TDH
The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development. The submersible pumps are located in the bottom of a 14’ prefabricated fiberglass sump, and the below grade valve assembly is located in a 5’ deep round prefabricated fiberglass valve vault. An outdoor UL listed control panel includes floats for primary and backup level controls and an autodialer for system communications.