The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.
Airway Industrial Park| Otay Mesa, CA | 2020 GPM - 14.4' TDH
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Georgia Transmission Corporation|Forsyth, GA| 55 GPM - 49' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
The City of Laguna Beach|Laguna Beach, CA|600 GPM - 77' TDH
This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.