The PDX TCORE pump station is the fifth project RU has done for the Port of Portland in the last five years. The station is the main wastewater pump station for all of PDX.
Charles T. Parker Extension | Scappoose, OR | 426 GPM - 67.8' TDH
Romtec Utilities worked with Cardno as they were the project driver. RU designed and supplied the lift station to fit the needs of the large development.
Dolce Vita Development | Granbury, TX | 486 GPM - 29' TDH
Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.
Argent Development Solutions | Beaumont, CA | 467 GPM - 99.3' TDH
The pump station was designed to the City of Beaumont’s standards which have adopted Eastern Municipal Water District requirements, as the city will also be the end owner of the system.
Pleasant Valley RV Park|Williston, ND|844 GPM - 38' TDH
A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth. The lift station controls are located in a nearby control building. The UL listed control panel utilizes floats for primary and backup level controls, an autodialer for communications, and a permanent onsite generator for backup power.