Federal Law Enforcement Training Center

Federal Training Center|Bruswick, GA|40 GPM - 15' TDH

jweddell5gpm - 50gpm, Eastern, Military Installations, Municipal Collection, Municipal Lift Station Replacement, Wastewater

This was a true lift station replacement by installing a new package lift station “in the hole” of the removed wet well. Submersible pumps in a duplex configuration were included to meet the low sewage flows from the federal training facility. The system valves were installed in the discharge piping inside the wet well to reduce cost and simplify the system. An outdoor alternator panel handles the controls for this package lift station. It was designed with floats for liquid level sensing and a basic alarm.

Dow Chemical Company

Dow Chemical Company|Plaquemine, LA|350 GPM - 90' TDH

jweddell50gpm - 100gpm, Central, Oil & Gas, Wastewater

This package wastewater lift station replacement was delivered largely preassembled for quick and simple installation by the customer. This procedure provided an expertly designed lift station that would uphold the privacy values of the facility. The fiberglass wet well arrived with mounting hardware, discharge piping, and the valve assembly preinstalled. Only the duplex solids handling pumps needed to be lowered after installation of the sump. An outdoor UL listed control panel was designed with float controls for liquid level-sensing and included an autodialer for communications.