Romtec Utilities specializes in the design and engineering of pump and lift station systems. This expertise gives our staff a great insight for clients into how to create a modern and safe pump station in a submersible configuration.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
Battleground School District|Vancouver, WA| 127 GPM - 103.4' TDH
Romtec Utilities was asked to design and supply a wastewater lift station for the Battleground School District in Southern Washington. The new pumping system was one aspect of a large facilities improvement project for the school grounds and would be owned by the school district.
City of Norco|Norco, CA| 150, 200 GPM - 66.7', 46.7' TDH
Romtec Utilities designed, supplied, and manufactured two wastewater lift stations for the City of Norco, California. The sewer systems are replacing two existing lift stations to meet the growing flows in the neighborhood.
Clark Regional Wastewater District | Vancouver, WA | 392 GPM - 88.6' TDH
Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington. The location of the development required Romtec Utilities to adhere to the robust design standards of the Clark Regional Wastewater District (CRWWD) for new lift stations.