The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Port of Portland|Portland, OR|18,140 GPM - 10.62' TDH
The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.
Kings Mountain Energy Center|Kings Mountain, NC|480 GPM - 35' TDH
A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Sunshine Canyon Landfill|Los Angeles, CA|195 GPM - 91.4' TDH
Republic Services, Inc. needed a new pump station to handle medium flows of wastewater in the form of treated leachate from its Sunshine Canyon Landfill.