The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Pioneer Place|Ridgefield, WA|350 GPM - 116' TDH
A new residential development in Ridgefield, Washington needed a wastewater lift station to handle medium flows of sewage from the new houses. 23 hp Flygt submersible pumps were engineered in a duplex configuration to meet the expected peak flow rates.
Pomona College | Claremont, CA | 370 GPM - 14.5' TDH
Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.
Kelso Village | Kelso, WA | 308 GPM - 112' TDH
A new development for a commercial park needed this wastewater lift station to connect the development to the municipal sewer system. Submersible centrifugal pumps in a duplex configuration were engineered to meet the medium flow high head conditions of the force main. This system needs to pump at a predefined flow rate in order to achieve the minimum force to reach the existing municipal sewer lines. The lift station control panel is a UL listed panel with redundant float controls wired for intrinsically safe use.