Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada. Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system according to their design requirements.
Oxnard School District|Oxnard, CA| 70, 92 GPM - 13.3', 8.5' TDH
Romtec Utilities provided two wastewater lift stations for the renovation of Elm Street Elementary School in Oxnard, California. The two systems will be privately owned and maintained by the Oxnard School District.
Georgia Transmission Corporation|Forsyth, GA| 55 GPM - 49' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Pacific Rim Apartments|Warrenton, OR| 95 GPM - 36.3' TDH
The construction of a new apartment complex in Warrenton, Oregon required a lift station to handle wastewater from approximately 60 new apartment units.
Exelon|Medway, MA| 30 - 70 GPM - 10' - 35'
The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.