Project Site of the Lakehurst Naval Air Station Wastewater Lift Station

Lakehurst Naval Air Station|Trenton, NJ|250 GPM - 24.77' TDH

jweddell100gpm - 300gpm, Bid Packages, Eastern, Featured Projects, Military Installations, Municipal Collection, Sewer System Expansion, Tech Info, Wastewater

This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage. A UL listed control panel was designed and manufactured in a NEMA 4 enclosure for outdoor operation. Nolta floats were used for the in-well liquid level sensing. The below-grade structural components were designed and supplied precast concrete vaults painted with a marine epoxy exterior coating to prevent moisture incursion.

Marine Corps Base Camp Pendleton

US Marine Corps Base|Camp Pendleton, CA|1,585 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Grinder Vault, Military Installations, Municipal Collection, Pacific, Sewer System Expansion, Slurry/Gritty Water, Wastewater

The Marine Corps Base Camp Pendleton needed this large wet-dry wastewater lift station to replace an existing system to allow the construction of new enlisted quarters. The new lift station included triplex dry-pit pumps to handle super-high flows of sewage from the facilities. An 8’ diameter precast concrete sump collects the sewage. Suction lines connect the sump to a 200-square-foot rectangular dry pit where the pumps, flow meter, and valve assembly are located. This lift station also includes an upstream grinder pit with a Macho Monster sewage grinder to pulverize solids into passable sizes.