This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.
Old Highway 99 N | Roseburg, OR
Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.
Highgate Community|Bakersfield, CA | 450 GPM - 50 TDH
Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
McCormick Lift Station Upgrades| Port Orchard, WA | 3800 GPM - 142' TDH
The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.
The Line at Santa Ana|Santa Ana, CA | 720, 600 GPM - 31', 21' TDH
The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.