The renovation of the University of Washington’s Husky Stadium required a new lift station to handle medium flows of wastewater. Robust, 10hp Vaughan Chopper pumps were used in a duplex configuration to macerate solids and to pump under unpredictable conditions. The lift station, valve vault, and the access hatches were designed as traffic rated to accommodate loading/unloading next to the main grandstand. The UL listed control panel starts, stops, and alternates each pump cycle at levels measured by Noltaniva float sensors.
Tesoro Corporation|Port Angeles, WA|400 GPM - 30' TDH
A remote Tesoro Corporation industrial site needed this stormwater pump station to handle water discharged from an oil/water separator which processes on-site runoff. Submersible centrifugal pumps were used in a duplex configuration in this shallow wet well. The 7.5 hp Ebara explosion-proof pumps were sized to meet low flow, medium head conditions for stormwater. Check valves and plug valves were integrated into the discharge piping in the well for a simple and cost-effective design. The precast concrete wet well and the access hatch are both pedestrian rated.
The City of Camas | Camas, WA | 126 GPM - 206' TDH
In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows. The wastewater is pumped at 120 gpm 10,000 lineal feet of 10” force main against 206’ TDH with 23 hp high head submersible solids handling pumps. A sheltered control panel utilizes an intrinsically safe barrier for in-well electrical, such as the pressure transducer and conductive probe for primary and backup level controls.
Holt Homes | Camas, WA | 415 GPM - 117' TDH
A large residential development required this package lift station to meet the high sewage flows for over 330 residential lots. Two inlet lines are fitted with deflector panels to reduce the in-well turbidity and protect the duplex submersible solids handling pumps from cascading influent. A below-grade valve vault contains the system valves, access ports, and pressure gauges. A sheltered, outdoor control panel utilizes a pressure transducer and backup conductive probe for liquid level-sensing and is connected to an emergency backup generator.
Microsoft Corporation|Quincy, WA|120 GPM - 70' TDH
Four identical lift stations were supplied to address sewage and cooling process wastewater from this commercial facility. This was the final of four lift stations supplied to Microsoft’s 70-acre data center. Aircraft rated hatches are included for each lift station to handle heavy forklift traffic. Ebara submersible sewer pumps handle the medium flow and average head condition of the system. An outdoor UL listed control panel utilizes an intrinsically safe barrier for in-well electrical controls and utilizes float controls for liquid level-sensing.