Kings Mountain Energy Center

Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH

jweddell300gpm - 500gpm, 500gpm - 1,000gpm, Corrosive/ Caustic Pumping, Eastern, High Temperatures, High/Low pH, HRSG Blowdown, HRSG Pumping, Industrial, Industrial Water, Power Generation, Process Water

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Kings Mountain Energy Center

Middletown Energy Center|Middletown, OH|40 GPM - 25' TDH

jweddell5gpm - 50gpm, Corrosive/ Caustic Pumping, Eastern, High Temperatures, High/Low pH, HRSG Blowdown, HRSG Pumping, Industrial, Industrial Water, Power Generation, Process Water

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

City of Brawley

City of Brawley Water Treatment | Brawley, CA | 1,350 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Control Buildings Shelters, First Flush, Meter Vaults, Municipal Collection, Pacific, Process Water, Treatment Plants, Wastewater, Water Recirculation, Water Reuse

The City of Brawley needed this packaged lift station to handle high flows of wastewater at its municipal treatment plant. 12 HP submersible pumps in a duplex configuration were used to meet the high flow pumping needs and a conductive probe was used for liquid level-sensing. The in-ground valve assembly and meter assembly were each located in separate vault structures for a cost effective design and easy access. An outdoor, UL listed control panel was protected from weather and sunlight by a six-post shelter, which also covers the sump entry hatch and electric disconnect panel.