The Portside Phase 3 project was part of a new industrial development by Specht Development. Located in Vancouver, Washington, this industrial development was in need of a wastewater lift station and Perlo Construction, the awarded general contractor, brought this opportunity to Romtec Utilities.
Grain Millers, Inc.|Junction City, OR| 70 GPM - 38' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.
Orlando Utility Commission|Orlando, FL| 100, 800 GPM - 85.6', 135' TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
East Bay Municipal Utility District|Berkeley, CA|2,085 GPM - 118' TDH
Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.
Dan River Steam Station|Eden, NC|300 GPM - 20' TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.