The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
Grain Millers, Inc.|Junction City, OR| 70 GPM - 38' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
Coffee & Downing|Bakersfield, CA| 130 GPM - 33.2' TDH
A private commercial development required a new lift station to handle medium flows of wastewater from several new retail buildings, including multiple restaurants.
Roseburg Urban Sanitary Authority|Roseburg, OR| 197 GPM - 45.3' TDH
Romtec Utilities was hired to design and supply a wastewater lift station for an industrial development in Roseburg, Oregon.
- Page 1 of 2
- 1
- 2