The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
Educational Realty Trust|Sacramento, CA | 24.1 GPM - 24.1' TDH
Romtec Utilities designed and supplied a stormwater pump station for the new Army Depot Park in Sacramento, California. The pump station was designed for the 10-year storm and is capable of pumping 930 gallons of stormwater per minute.
Highgate Community|Bakersfield, CA | 450 GPM - 50 TDH
Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH
Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.
The Line at Santa Ana|Santa Ana, CA | 720, 600 GPM - 31', 21' TDH
The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.





