Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer systems for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.
Orlando Utility Commission|Orlando, FL| 100, 800 GPM - 85.6', 135' TDH
Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
DOW Chemical|South Charleston, WV| 60 GPM - 25' TDH
Union Carbide Corporation, a subsidiary of DOW Chemical, required a new stormwater pump station as part of a larger groundwater containment and remediation system in South Charleston, West Virginia.
Cedar Point Sports Center|Sandusky, OH|75 GPM - 60' TDH
Romtec Utilities provided a complete wastewater lift station for a sports park in Ohio. This lift station collects wastewater from the on-site facilities and then pumps into an existing force main.
Dan River Steam Station|Eden, NC|300 GPM - 20' TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.





