City of Brawley

City of Brawley Water Treatment | Brawley, CA | 1,350 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Control Buildings Shelters, First Flush, Meter Vaults, Municipal Collection, Pacific, Process Water, Treatment Plants, Wastewater, Water Recirculation, Water Reuse

The City of Brawley needed this packaged lift station to handle high flows of wastewater at its municipal treatment plant. 12 HP submersible pumps in a duplex configuration were used to meet the high flow pumping needs and a conductive probe was used for liquid level-sensing. The in-ground valve assembly and meter assembly were each located in separate vault structures for a cost effective design and easy access. An outdoor, UL listed control panel was protected from weather and sunlight by a six-post shelter, which also covers the sump entry hatch and electric disconnect panel.

City of Camas Washington

The City of Camas | Camas, WA | 126 GPM - 206' TDH

jweddell100gpm - 300gpm, Municipal Collection, Odor Control, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows. The wastewater is pumped at 120 gpm 10,000 lineal feet of 10” force main against 206’ TDH with 23 hp high head submersible solids handling pumps. A sheltered control panel utilizes an intrinsically safe barrier for in-well electrical, such as the pressure transducer and conductive probe for primary and backup level controls.

West Mesa Industrial Park

West Mesa Industrial Park|Las Cruses, NM|733 GPM - 44' TDH

jweddell500gpm - 1,000gpm, Industrial Process Water featured, Industrial Water, Mountain, Municipal Collection, Replacements & Retrofits, Wastewater

The US Army Corps of Engineers worked with Romtec Utilities to design this lift station to replace an existing septic system. The resulting package wastewater lift station met the high sewage flows of this publicly owned industrial complex. The submersible sewage pumps in a duplex configuration are explosion proof to meet the wet well space classification. An outdoor UL listed panel utilizes floats and a pressure transducer for intrinsically safe level controls. It also includes an autodialer for communications and a blower for odor control.

City of Clovis New Mexico

The City of Clovis | Clovis, NM | 100 GPM - 15.4' TDH

jweddell50gpm - 100gpm, Mountain, Municipal Collection, Sewer System Expansion, Wastewater

An expanding sewer system for annexed land required this packaged wastewater lift station. Duplex submersible solids handling pumps are designed to meet the medium flow requirements and pass solids up to a 2” diameter. To save space, the system valves are integrated into the discharge piping in the sump. An outdoor control panel utilizes floats for liquid level-sensing and an intrinsically safe barrier for in-well electrical components. The electrical controls are wall mounted.

Marine Corps Base Camp Pendleton

US Marine Corps Base|Camp Pendleton, CA|1,585 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Grinder Vault, Military Installations, Municipal Collection, Pacific, Sewer System Expansion, Slurry/Gritty Water, Wastewater

The Marine Corps Base Camp Pendleton needed this large wet-dry wastewater lift station to replace an existing system to allow the construction of new enlisted quarters. The new lift station included triplex dry-pit pumps to handle super-high flows of sewage from the facilities. An 8’ diameter precast concrete sump collects the sewage. Suction lines connect the sump to a 200-square-foot rectangular dry pit where the pumps, flow meter, and valve assembly are located. This lift station also includes an upstream grinder pit with a Macho Monster sewage grinder to pulverize solids into passable sizes.