development stormwater lift station

Residential Development Wastewater Pump Station in Huntington Beach, CA

150 GPM
13.8′ TDH

jweddell100gpm - 300gpm, Pacific, Residential Development, Wastewater, Wastewater Featured

Huntington Beach, California Housing Development Wastewater Lift Station Development Wastewater Pump Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This housing development wastewater lift station is for a new neighborhood, known as Seamark, in Huntington Beach, California. Romtec Utilities designed, manufactured, and supplied this wastewater lift station for the developers, Brookfield Properties. Fuscoe Engineering brought us into this project after they connected us with the developers. We provided a wastewater lift station along with a ...
phased residential

Wastewater Pump Station in Beaumont, California – Middle Oak Valley LS

763 GPM
220′ TDH

jweddell500gpm - 1,000gpm, Pacific, Residential Development, Wastewater, Wastewater Featured

Beaumont, California Phased Residential Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this phased residential wastewater lift station, we partnered with Meritage Homes, the developer of The Fairways in Beaumont, California. The residential community includes a resort pool, lap pool, splash pad, fitness center, and the Morgongo Golf Club at Tukwet Canyon. This phased residential development wastewater pump station project has been ongoing for many years and met the City of Beaumont’s EMWD ...
development stormwater lift station

Huntington Beach, California Housing Development Stormwater Lift Station

460 GPM
14′ TDH

jweddell300gpm - 500gpm, Apartment Complexes, Pacific, Residential Development, Stormwater, Stormwater Featured, Urban Growth

Huntington Beach, California Housing Development Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS New Housing Development Stormwater Lift Station A new housing development stormwater lift station was needed for a construction project in Huntington Beach, California. This was for a new housing development called Seamark that involved 85 homes being built next to Gisler Park. Fuscoe connected us with the project, as they were the civil engineer and brought us into contact with ...
Stormwater Management System La Habra, California, stormwater pump station project

La Habra, California, stormwater pump station project

1,293 GPM
13.85′ TDH

jweddell1,000gpm - 5,000gpm, Public Works, Stormwater

La Habra, California, Stormwater Management System Stormwater Lift Station Project Assets DRAWINGS SITE-PLANS Romtec Utilities engineered and supplied a stormwater pump station project for a new Krispy Kreme location in La Habra, California – because nothing ruins a good doughnut run like a flooded parking lot. The stormwater management system helped a global brand open a new location in a growing community, while preparing for heavy rainfall. A reliable pump system was essential to keep ...
Mixed-Use Residential Development Wastewater Lift Station

Phoenix, Arizona Mixed Use Development Wastewater Lift Station

500 GPM
25.4′ TDH

jweddell500gpm - 1,000gpm, Mixed Use, Public Works, Residential, Residential Development, Wastewater

Phoenix, Arizona Mixed Use Development Wastewater Lift Station Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this mixed-use residential development wastewater lift station, Romtec Utilities provided the owners with a system to meet this premium downtown residential and commercial setting that provides a variety of amenities. This mixed-use development wastewater lift station is housed inside of the building, a unique building that features pools, a spa, lounge and kitchen, cabanas, citrus groves, and ...