100gpm – 300gpm
Recent Projects
Stanislaus County | Package Wastewater Lift Stations
200 GPM | 21′ TDH
Caltrans needed to upgrade their Westley Safety Roadside Rest Area (SRRA) buildings to expand and update the Northbound and Southbound facilities. We developed a package for two wastewater lift stations and presented to ReCom then contracted with Capital Flow due to meet the Disabled Veteran Owned Company requirements on this project.
City of Port Orchard | Residential Wastewater Lift Station
154 GPM | 93.5′ TDH
Romtec Utilities was contacted by GFK Consulting, Inc., who are very familiar with us from previous projects. We worked with Contour Engineering LLC in the development of the 30% design package. This wastewater lift station has Vaughan submersible pumps and Allen-Bradley CompactLogix as the primary controller.
Township of Lakewood | Residential Development Wastewater Lift Station
100 GPM | 41.1′ TDH
Romtec Utilities was proud to be part of this wastewater lift station in Lakewood, New Jersey for the developer and the various players as we designed and supplied the entire lift system. The lift system features a duplex configuration of 5hp Ebara submersible pumps and an FMX21 pressure transducer.
100gpm – 300gpm
Jacobsen Development Group | Residential Stormwater Lift Station
320, 280 GPM | 23.7, 24.5′ TDH
Romtec Utilities provided two stormwater pump stations for the Torrance Memory Care Housing unit in Torrance, California. Jacobsen Development Group are the owners who developed the Torrance Memory Care housing project.
City of Los Angeles | Wastewater Pump Station
115 GPM | 52.1′ TDH
The Sun Valley project involves upgrading an existing waste management facility which has a large stormwater and smaller wastewater pump station. Romtec Utilities designed, manufactured, and supplied this wastewater lift station to fit the needs of the upgraded facility.
City of Shafter, CA | Municipal Wastewater System
276 GPM | 25.7′ TDH
The City of Shafter contacted Romtec Utilities to provide a new wastewater lift station for a combined Shafter Caltrans project. The City of Shafter wanted a pumping system that met their standards and will be operated and maintained by the city.
University of Portland | Replacement Wastewater Lift Station
214 GPM | 163.4′ TDH
Romtec Utilities worked on the replacement to an existing wastewater lift station that the University of Portland needed for the four separate new facilities which will feed into this lift station.
City of Troutdale | Residential Wastewater Lift Station
57 GPM | 30.9′ TDH
The Sheldon Development project needed a wastewater lift station for the private apartment complex that requires a privately owned and maintained pump station to serve the sewer for the site.
City of Hillsboro | Data Center Lift Station
110 GPM | 21.8′ TDH
The civil engineer was Navix Engineering, who reached out to Romtec Utilities looking for assistance with the design of a wastewater lift station for an industrial project for T5 data centers in Hillsboro, OR.
City of Longview, WA | Residential Lift Station
128 GPM | 39′ TDH
This Mt. Solo lift station was for a new housing development by Hinton Development in Longview, Washington.
Gresham-Barlow School District | Two Wastewater Package Pump Stations
135 GPM | 69.4′ TDH
Romtec Utilities completed two wastewater pump station for the Gresham-Barlow School District and Sam Barlow High School.
Indian Health Service | Stormwater Lift Station
215 GPM | 18.6′ TDH
The IHS is the Federal Health Program for American Indians and Alaska Natives, and worked with Cecil & Cecil in a larger project to construct a new in-patient clinic for substance abuse.
San Bernardino Municipal Water Department | Wastewater Lift Station
188 GPM | 20.4′ TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Trammell Crow Residential | Wastewater Lift Station
211 GPM | 23.6′ TDH
Romtec Utilities supplied a wastewater lift station to service a new apartment building by Trammell Crow Residential in San Diego, California.
West Sound Utility District | Wastewater Pump Station
280 GPM | 145.2′ TDH
Romtec Utilities worked with two different developers and the West Sound Utility District for the supply of a wastewater lift station.
Union Pacific Railroad | Stormwater Lift Station
150 GPM | 15.3′ TDH
Romtec Utilities supplied a stormwater pump station for a new Union Pacific Railroad Maintenance Office. The lift station was needed to empty a stormwater detention pond, and pump the water to an existing gravity drain system.
Sacramento Regional County Sanitation District | Wastewater Lift Station
180 GPM | 27′ TDH
Romtec Utilities supplied a wastewater lift station that will be owned and maintained by the Sacramento Regional County Sanitation District.
Kitsap County | Wastewater Pump Station
146 GPM | 46.4′ TDH
Romtec Utilities supplied a wastewater pump station to serve a residential/townhome development by Norpoint Communities in Kitsap County, Washington.
Ontario Christian High School | Wastewater Lift Station
226 GPM | 23.8′ TDH
In Ontario, California, the Ontario Christian High School was undergoing renovations. The General Contractor (GC) CCI was building a new, state of the art building that would be a dual student center and athletic facility.
Yocha Dehe Wintun Nation | Wastewater Pump Station
206 GPM | 142.9′ TDH
The Mossy Creek project is a wastewater lift station for a new development to support the Cache Creek Casino Resort.
Montage Healdsburg | Wastewater Pump Station
120 GPM | 49.9′ TDH
Located in Healdsburg, California, the Montage Healdsburg, was in need of a new sewer wastewater lift station. This new resort is nestled in Wine Country, and located close to numerous wineries and fine dining that draw in visitors to Healdsburg every year.
Northshore Utility District | Wet-Dry Lift Station for Residential Development
153 GPM | 130′ TDH
Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.
Net Lease Alliance | Stormwater Lift Station
200 GPM | 12.4′ TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.
Portside Phase III | Industrial Wastewater Lift Station
100 GPM | 22′ TDH
The Portside Phase 3 project was part of a new industrial development by Specht Development. Located in Vancouver, Washington, this industrial development was in need of a wastewater lift station and Perlo Construction, the awarded general contractor, brought this opportunity to Romtec Utilities.
United Natural Foods Inc. | Combined Private and Public Sewer Lift Station
187 GPM | 32.8′ TDH
Romtec Utilities was hired to design and supply a wastewater lift station to expand the sewer infrastructure in Ridgefield, WA. The lift station was for an expansion of a commercial distribution center for United Natural Foods, Inc. or UNFI.
Sammamish Plateau Water | Wastewater Lift Station for Residential Development
141 GPM | 185′ TDH
The construction of the Cedar Hill housing development in Sammamish, Washington required a wastewater lift station to connect new homes into the existing sewer infrastructure.
Halifax Regional Water Commission | International Wastewater Lift Station
220 GPM | 45.4′ TDH
Romtec Utilities was contacted to replace two aging wastewater lift stations with a modern system capable of handling their combined flow in Bedford Nova Scotia in Canada.
Public Service Enterprise Group | Industrial Stormwater Pump Station
225 GPM | 11.7′ TDH
Romtec Utilities was contacted to design and supply a stormwater pump station as part of an improvement project at an industrial power switch station in Trenton, New Jersey. This is one of several locations where aging infrastructure is being replaced by the local electric company, Public Service Enterprise Group, or PSE&G.
Battleground School District | Wastewater Lift Station for School Improvement
127 GPM | 103.4′ TDH
Romtec Utilities was asked to design and supply a wastewater lift station for the Battleground School District in Southern Washington. The new pumping system was one aspect of a large facilities improvement project for the school grounds and would be owned by the school district.
City of Vancouver | Wastewater Packaged Pump Station
272 GPM | 161.3′ TDH
Romtec Utilities was contacted to provide a package wastewater lift station for Columbia Palisades, a mixed-use development in Vancouver, Washington. This large development project by Airpark Development will transform 84-acres of an old rock quarry into an urban neighborhood with residential units, commercial spaces, and offices.
Southgate Water District | Booster Pump Station & Integrated Control Building
125 GPM | 75′ TDH
Romtec Utilities designed and supplied a booster pump station and an integrated control building for an upscale development. This booster system regulates water pressure for the newly constructed homes.
City of Norco | Sewer System Replacement Lift Stations
150, 200 GPM | 66.7′, 46.7′ TDH
Romtec Utilities designed, supplied, and manufactured two wastewater lift stations for the City of Norco, California. The sewer systems are replacing two existing lift stations to meet the growing flows in the neighborhood.
Town of Samoa | Housing Development & Fire Hydrant Booster Pump Station
1000, 200-600 GPM | 150′ TDH
Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.
Coffee & Downing | Retail Buildings Lift Station
130 GPM | 33.2′ TDH
A private commercial development required a new lift station to handle medium flows of wastewater from several new retail buildings, including multiple restaurants.
Kitsap County | Wastewater Packaged Pump Station
130 GPM | 61.4′ TDH
Romtec Utilities was hired to provide the design and supply of a wastewater lift station for Settlers Field, a new residential development in Bremerton, Washington, across the sound from Seattle.
North Bend Cottages | Stormwater Pump Station for Small Housing Development
130 GPM | 12.5′ TDH
Romtec Utilities designed and supplied a stormwater pump station for a small housing development in North Bend, Washington.
Roseburg Urban Sanitary Authority | Sewer Lift Station in Industrial Zone
197 GPM | 45.3′ TDH
Romtec Utilities was hired to design and supply a wastewater lift station for an industrial development in Roseburg, Oregon.
Kitsap County | Wastewater Lift Stations on the Manchester Shoreline
210 GPM | 34′ TDH
Romtec Utilities was contacted to design and supply three new wastewater lift stations for the Manchester residential area on the Kitsap Peninsula.
Clark Regional Wastewater District | Wastewater Lift Station for Residential Development
258 GPM | 94.7′ TDH
Romtec Utilities designed and supplied a wastewater lift station for a new residential development in the City of Ridgefield, Washington. The development and lift station will be completed in phases to meet the growing flow rates of the service area.
City of Ashland, OR | Municipal Sewer Lift Station Retrofit
156 GPM | 55.7′ TDH
Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.
City of Stanwood | Fully Integrated Lift Station and Control Building
160 GPM | 44′ TDH
The Mineral Point housing development in the City of Stanwood, Washington required a wastewater lift station to convey sewage to treatment for newly constructed houses.
Sammamish Plateau Water & Sewer District | Wastewater Lift Station
110 GPM | 66.5′ TDH
Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.
Long Beach Exchange Retail | Five Identical Stormwater Pump Stations
150 GPM | 15.9′ – 18.7′ TDH
Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.
Roseburg Urban Sanitary Authority | Municipal Sewer Lift Station
258 GPM | 16.9′ TDH
The Roseburg Urban Sanitary Authority needed a new lift station to handle medium flows of sewage from a residential neighborhood. This precast concrete wet well is a deep well for sewer, going nearly 30 feet below grade.
City of Los Angeles | Venice Dual Force Main Lift Station
200 GPM | 15′ TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Naval Base Kitsap | Multiple Lift Stations for a High Security Base
100-1,160 GPM | 40′-130′ TDH
Romtec Utilities designed, engineered, and manufactured five unique lift stations for the Naval Base Kitsap in Washington.
Kitsap County | Wastewater Lift Stations for Residential Community
195-265 GPM | 21′-37′ TDH
Romtec Utilities provided 3 wastewater lift stations for Manchester Residential Area outside of Seattle, WA.
Douglas County Nevada | Residential Development
99 – 165 GPM | 224.7′ – 267′ TDH
The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.
Pacific Grove Golf Course | Wastewater Pump Station for Effluent Recycling
230 GPM | 18.5′ TDH
The Pacific Grove Golf Course in California needed a wastewater lift station to pump medium flows of raw sewage to an effluent treatment and recycling system. This lift station was engineered with 3 hp Ebara submersible centrifugal pumps in a duplex configuration.
Camphora Lift Station | Affordable Housing Apartment Complex
140 GPM | 137.6′ TDH
Romtec Utilities designed and supplied a wastewater lift station for an apartment complex in Soledad, California. This lift station pumps into an existing force main owned by the nearby Soledad Prison.
Doheny Village | Duplex Wastewater Lift Station
120 GPM | 30.1′ TDH
The City of Dana Point, California wanted to improve the Doheny Village neighborhood as part of a revitalization effort. One improvement included a new wastewater lift station to handle medium sewage flows from a new condominium development.
Dan River Steam Station | Combined Cycle Blow Down Pumping
300 GPM | 20′ TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
Manorwood Homes | Residential Development Lift Station Retrofit
200 GPM | 27.5′ TDH
A residential development that was put on hold during the recession of the housing market needed a lift station retrofit when the development was brought back to life.
River Ridge Apartments | Apartment Complex Booster Pump Station
270 GPM | 100′ TDH
A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.
City of Bremerton | Modern Residential Development
160 GPM | 118′ TDH
The City of Bremerton needed a new sewer lift station to handle medium flows of wastewater from a new residential development.
BAE Acetic Acid Plant | Corrosive Water Pumping Skid
300 GPM | 30′ TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Sunshine Canyon Landfill | Leachate Pump Station
195 GPM | 91.4′ TDH
Republic Services, Inc. needed a new pump station to handle medium flows of wastewater in the form of treated leachate from its Sunshine Canyon Landfill.
Clark Regional Wastewater District | Jessie Hollow Residential Development
124 GPM | 35′ TDH
Krippner Homes needed a new lift station to handle medium flows of sanitary sewer from a new residential development.
Snoqualmie Ridge Residential Development | Municipal Design Standards
115 GPM | 57.3′ TDH
A new housing development in the City of Snoqualmie needed this wastewater lift station to handle low sewage flows and meet the City’s design standards.
IBM Resiliency Services | Data Center Wastewater Pumping
270 GPM | 36′ TDH
The IBM Boulder Data Center needed to replace a wastewater lift station with a new system to handle medium flows of wastewater generated at the facility. A precast concrete sump includes a pedestrian rated hatch with a safety grate for reliable fall protection.
Lakehurst Naval Air Station | Low-Cost Sewage Lift Station
250 GPM | 24.77′ TDH
This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage.
DJ Farms | Large Residential Development
135 GPM | 36.8′ TDH
This City of Guadalupe, California needed a new wastewater lift station to accommodate a residential development for up to 800 homes.
City of Port Orchard | Residential Development Wastewater Lift Station
200 GPM | 64′ TDH
The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development.
Metro East Sanitary District | Municipal Sewer Lift Stations
123 GPM | 21′ TDH
A large neighborhood received these two lift stations that were designed to handle medium sewage flow requirements. The submersible solids-handling pumps in duplex configurations were specified to handle influent from three inlet lines from different sections of the neighborhood.
Elsinore Valley Municipal Water District | Oak Springs Ranch
262 GPM | 53.9′ TDH
This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing.
King Sooper’s Marketplace | Commercial Development Lift Station
150 GPM | 6.8′ TDH
The food & drug store serving a nearby university needed this replacement package wastewater lift station for medium flow rates. Submersible solids handling pumps are designed to operate with suspended grease in the water from a cafeteria in the market.
Plantation Pipe Line | Low-Cost Stormwater Pump Station
175 GPM | 90′ TDH
This package stormwater lift station was configured to meet the medium runoff flow of this industrial property. One submersible centrifugal pump makes this a simplex station with an in-well check valve. The single pump handles high head conditions caused by 9,000 feet of 4” force main.
City of Shafter | Municipal Sewer Expansion Lift Station
110 GPM | 28.4′ TDH
This package lift station is part of a sustained plan to expand the collection system of a large sewage treatment plant completed in 1999. The medium flow is handled by submersible solids handling pumps in a duplex configuration.
Federal Law Enforcement Training Center | Lift Station Replacement
150 GPM | 30′ TDH
This replacement wastewater lift station was designed to meet the medium sewage flow requirements of this federal training facility. Submersible solids-handling pumps in a duplex configuration pumps the effluent through in-well valves and out a three-inch force main.
County of Del Norte | Municipal Sewer Lift Station
220 GPM | 36′ TDH
To extend the sewer system for Crescent City in Del Norte County, this sewage lift station was added to a new gravity line and force main. Duplex submersible chopper pumps pump the sewage to an existing gravity line and on to treatment.
Vega Meadows Road Development | Fiberglass Lined Lift Station
297 GPM | 57′ TDH
This package wastewater lift station handles sewage flows from this large residential development neighborhood. Duplex submersible solids handling pumps pump a high flow rate from this 30’ deep wet well. The wet well includes an interior fiberglass lining and exterior coating.
Coyote Springs | Housing Development Sewer Lift Station
121 GPM | 55′ TDH
This package lift station system was designed to meet the medium sewage flows of this new residential development and private golf course. Submersible solids handling pumps in a duplex configuration manage the influent for this deep well, and an above-grade valve assembly maintains proper discharge operations.
Seattle Parks and Recreation, South Lake Union Park | Sewer Lift Station
145 GPM | 20.8′ TDH
A renovation of South Lake Union Park required a package lift station configured to meet the medium sewage flow requirements for a municipal and commercial wastewater system. Submersible solids handling pumps in a duplex configuration are protected from turbulence and cascading influent by a drop bowl.
United States Army Prime Power School | Two Distinctive Lift Stations
300 GPM | 143′ TDH
These package lift stations were designed to meet the high head pumping requirements for this training facility of the US Army Corps of Engineers. For one station with over 7,000 ft. of 8” force main, 35 hp duplex submersible centrifugal pumps were supplied to achieve the 300 gpm flow rate.
City of Santa Helena, California | Extended Lift Station Project
254 GPM | 49.5′ TDH
This municipal lift station in the Napa Valley was designed to handle medium sewage flows and medium head conditions. Flygt sewer pumps were supplied in a duplex configuration to integrate with the Tops Basin and discharge elbows.
City of Santa Barbara, California | Dry-Season Stormwater Flows
275 GPM | 17′ TDH
The City of Santa Barbara needed this packaged pump station to manage low stormwater flows from events that occur during the dry season. Duplex submersible pumps capable of passing a 3-inch solid pump the water into an existing sanitary sewer pressure main and on to treatment.
California Institute for Men | Brine Wastewater Pumping Station
135 GPM | 30′ TDH
This package lift station was designed to meet the medium wastewater flows of this California prison. Solids-handling pumps in a duplex configuration are protected from cascading influent by a drop bowl. The liquid level-sensing is controlled by a pressure transducer and a float in used for emergency backup.
City of Camas | High Head Sewer Lift Station
126 GPM | 206′ TDH
In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows.
Los Alamos National Laboratory | High Security Lift Station
225 GPM | 41′ TDH
A high-security federal facility purchased this package lift station to meet medium sewage flow and classified installation requirements. Installation required a 13-foot-diameter hole for the wet well to be drilled to avoid a network of buried conduit and infrastructure.
Fresh & Easy Distribution Center | Commercial Wastewater Lift Station
170 GPM | 60′ TDH
The expansion of this distribution center for Fresh and Easy food products required a package lift station designed to meet medium wastewater flow requirements. This lift station for the 88-acre storage and supply facility uses an inlet line drop bowl to protect submersible solids-handling pumps in a duplex configuration from cascading influent and turbidity.
USDA Forest Service | Federal Sewer Lift Station
120 GPM | 90′ TDH
The Green Ridge Campground purchased this lift station replacement that was configured to meet the medium sewage flow requirements of the site. Submersible solids handling pumps in a duplex configuration are protected from influent and turbulence by an inlet line drop bowl.
Microsoft Columbia Data Center | Aircraft Rated Lift Stations
120 GPM | 60′ TDH
This large commercial facility needed identical lift stations to manage wastewater in the form of sanitary sewer and discharge water from the cooling processes. This was the second of four Romtec Utilities lift stations supplied to Microsoft’s 70-acre data center.
Microsoft Columbia Data Center | Identical Wastewater Lift Stations
120 GPM | 70′ TDH
Four identical lift stations were supplied to address sewage and cooling process wastewater from this commercial facility. This was the final of four lift stations supplied to Microsoft’s 70-acre data center. Aircraft rated hatches are included for each lift station to handle heavy forklift traffic.
Microsoft Columbia Data Center | Duplicate Wastewater Lift Stations
180 GPM | 40′ TDH
This package lift station was configured to meet the medium sewage flow requirements of a commercial wastewater system. This was the first of four lift stations supplied to Microsoft’s 70-acre data center. Aircraft rated hatches are included for each lift station to handle heavy forklift traffic.
Green Sanitary District | Low-Cost Municipal Lift Station
150 GPM | 56.8′ TDH
A large book distribution center required the local municipal agency to install this package wastewater lift station. The force main was installed via a horizontally drilled hole to the exact elevation of the wet well connection.
Microsoft Columbia Data Center | Mixed Commercial Wastewater
120 GPM | 60′ TDH
To handle a combination of sewer and cooling process wastewater, this commercial facility purchased four identical Romtec Utilities package lift stations. This was the third of four lift stations supplied to Microsoft’s 70-acre data center.
Sacramento Municipal Utility District | Deep Well Sewer Lift Station
172 GPM | 94′ TDH
The newly constructed headquarters for the Sacramento Municipal Utility District purchased this package lift station to meet its medium sewage flow requirements. Submersible solids-handling pumps in a duplex configuration were specified in a deep well because this facility represents one of the ten largest public utilities in the country.
Basin Electric Power Cooperative | Clean Water Industrial Pumping
130 GPM | 45′ TDH
The Groton Generating Station needed this package lift station to pump clean water as a part of its power generating processes from natural gas. The submersible centrifugal pumps in a duplex configuration meet the pumping requirements for this facility and discharge the water to parallel force mains.
Milan Federal Correctional Institute | Low-Cost Lift Station Retrofit
125 GPM | 22′ TDH
Two skid-mounted lift station systems retrofitted two existing stations for medium sewage flows at this federal correctional facility. Preassembled above-grade skids with Pioneer self-priming pumps in duplex configurations drop suction piping into the existing sumps to pump effluent to the existing force mains.
Occidental Petroleum at Elk Hills, Inc. | Industrial Water Reuse
200 GPM | 115′ TDH
This package pump station was configured to meet the medium flow requirements for this clean water power generation process and reuse system. The system has a large precast-concrete rectangular sump with a barrier wall –or weir wall- to reduce turbulence for the pumps.
Ajax Gas Plant | Industrial Stormwater and Process Water
200 GPM | 50′ TDH
This package pump station was designed to meet a low flow of industrial process water with added low flows of industrial stormwater. The dual purposes of this pump station required shaft-driven centrifugal pumps with the motors located above-grade.
Clark County Regional Wastewater District | Wastewater Lift Station
198 GPM | 51′ TDH
This package lift station was designed to meet municipal standards for medium sewage flows at this new commercial complex. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station.
U.S. Department of Energy, Hanford, Washington | 2704 HV Complex
180 GPM | 20′ TDH
This package lift station was designed to meet the medium sewage flow requirements of an industrial and commercial lift station. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station.