The new headquarters for the Sacramento Municipal Utility District needed this package pump station to handle high flows of stormwater.
Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH
Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.
Union Pacific City of Industry | 150 GPM - 15.3' TDH
Romtec Utilities supplied a stormwater pump station for a new Union Pacific Railroad Maintenance Office. The lift station was needed to empty a stormwater detention pond, and pump the water to an existing gravity drain system.
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.
Airway Industrial Park| Otay Mesa, CA | 2020 GPM - 14.4' TDH
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.





