A residential development that was put on hold during the recession of the housing market needed a lift station retrofit when the development was brought back to life.
East Bay Municipal Utility District|Berkeley, CA|2,085 GPM - 118' TDH
Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.
River Ridge Apartments|Tualatin, OR|270 GPM - 100' TDH
A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.
Port of Vancouver|Vancouver, WA|100 GPM - 18.4' TDH
To accommodate new rails line and a new administration building, the Port of Vancouver needed a new lift station to handle medium flows of sewage from the new facility.
Portland Airport|Portland, OR|100 GPM - 28.19' TDH
To accommodate a new private terminal and hanger, Portland Airport needed a new wastewater lift station to handle a medium flow of sewage from the new buildings.