Commercial

Recent Projects

Brixmor Logo
Brixmor Property Group | Commercial Pump Station
5 GPM | 9.1′ TDH

The Michaels Mira Mesa project in San Diego, California was a new small stormwater lift station for commercial development. Brixmor Property Group is the owner of the development.

Commercial

Madera Logo
City of Madera, CA | Wastewater Lift Station
550 GPM | 25′ TDH

The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the new housing development.

Clark Regional 400X400
Clark Regional Wastewater District | Phased Lift Station
350 GPM | 50.6′ TDH

Romtec Utilities worked with Rotschy, Inc. to supply a phased lift station for the Seton Pump Station project.

Douglas County Nevada
Valley Knolls – Carson City, NV | Wastewater Lift Station
117 GPM | 105′ TDH

The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the new housing development.

west-linn-wilsonville
West Linn-Wilsonville School District | Wastewater Package Pump Station
328 GPM | 27.3′ TDH

The Wilsonville High School auditorium expansion required a wastewater lift station for the West Linn-Wilsonville School District (WLWV) in Wilsonville, Oregon.

thumbnail_union0pacific
Union Pacific Railroad | Stormwater Package Pump Station
3740.5 GPM | 31.4′ TDH

This project was initially recognized as a rehabilitation project but Romtec Utilities and David Evans and Associates, Inc. determined that they needed a replacement lift station to meet their increased stormwater demands.

gresham-barlow-school-district-logo
Gresham-Barlow School District | Two Wastewater Package Pump Stations
135 GPM | 69.4′ TDH

Romtec Utilities completed two wastewater pump station for the Gresham-Barlow School District and Sam Barlow High School.

Port of Portland TCORE Project
Port of Portland | Industrial Wastewater Package Pump Station
2500 GPM | 59′ TDH

The PDX TCORE pump station is the fifth project RU has done for the Port of Portland in the last five years. The station is the main wastewater pump station for all of PDX.

City of Granbury Texas
City of Granbury, TX | Wastewater Package Pump Station
486 GPM | 29′ TDH

Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.

scappoose-oregon-logo-ru
City of Scappoose, OR | Wastewater Package Pump Station
426 GPM | 67.8′ TDH

Romtec Utilities worked with Cardno as they were the project driver. RU designed and supplied the lift station to fit the needs of the large development.

City of Beaumont California
City of Beaumont | Wastewater Package Pump Station
467 GPM | 99.3′ TDH

The pump station was designed to the City of Beaumont’s standards which have adopted Eastern Municipal Water District requirements, as the city will also be the end owner of the system.

RCC-Logo
Rogue Community College | Potable Water Booster Station
1333 GPM | 177′ TDH

Romtec worked with Marquess & Associates to provide them with the best value from an engineering, construction, and overall cost of maintenance standpoint.

microsoft-logo
Microsoft Silicon Valley Campus | Lift Stations
400 GPM | 20.5′ TDH

Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.

MARS Chocolate Factory Logo
MARS, Inc. | Stormwater Lift Station
22 GPM | 0′ TDH

The Romtec Utilities supplied lift station was installed onsite by Nordic Contracting Company, Inc.

Dermody Oxbow Wastewater Lift Station
Dermody Properties | Industrial Wastewater
400 GPM | 46′ TDH

The successful installation and start-up of this station has allowed Dermody Properties to continue their development in one of the “Puget Sound region’s major industrial centers”.

Indian Health Service Davis
Indian Health Service | Stormwater Lift Station
215 GPM | 18.6′ TDH

The IHS is the Federal Health Program for American Indians and Alaska Natives and worked with Cecil & Cecil in a larger project to construct a new in-patient clinic for substance abuse.

Developer Group Logo
Rockefeller Group | Stormwater Lift Station
2020 GPM | 14.4′ TDH

The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.

City of San Bernardino Water Department
San Bernardino Municipal Water Department | Wastewater Lift Station
188 GPM | 20.4′ TDH

The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.

US Navy Logo
NAVFAC | Industrial Process Water Pump Station
1000 GPM | 35′ TDH

The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.

West Sound Utility District Logo
West Sound Utility District | Wastewater Pump Station
280 GPM | 145.2′ TDH

Romtec Utilities worked with two different developers and the West Sound Utility District for the supply of a wastewater lift station.

Kitsap County Washington
Kitsap County | Wastewater Pump Station
146 GPM | 46.4′ TDH

Romtec Utilities supplied a wastewater pump station to serve a residential/townhome development by Norpoint Communities in Kitsap County, Washington.

Trammell Crow Residential Logo
Trammell Crow Residential | Wastewater Lift Station
211 GPM | 23.6′ TDH

Romtec Utilities supplied a wastewater lift station to service a new apartment building by Trammell Crow Residential in San Diego, California.

Hesperia
City of Hesperia | Booster Station
700 GPM | 150′ TDH

The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.

los-angeles-county-seal-vector-891531
Hancock Parkway Properties | Stormwater Lift Station
450 GPM | 15.8′ TDH

The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.

Gulf Coast Growth Ventures
Gulf Coast Growth Ventures | Wastewater Pump Station

The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.

Bridge Development Partners
Bridge Development Partners | Stormwater Lift Station
50 GPM | 15.3′ TDH

For their new development, the location was in need of a Romtec Utilities stormwater lift station to collect runoff water from the building and parking lot areas.

Taking the Waste Out of Water
Sacramento Regional County Sanitation District | Wastewater Lift Station
180 GPM | 27′ TDH

Romtec Utilities supplied a wastewater lift station that will be owned and maintained by the Sacramento Regional County Sanitation District.

thumbnail_union0pacific
Union Pacific Railroad | Stormwater Lift Station
150 GPM | 15.3′ TDH

Romtec Utilities supplied a stormwater pump station for a new Union Pacific Railroad Maintenance Office. The lift station was needed to empty a stormwater detention pond, and pump the water to an existing gravity drain system.

Montage Healdsburg
Montage Healdsburg | Wastewater Pump Station
120 GPM | 49.9′ TDH

Located in Healdsburg, California, the Montage Healdsburg, was in need of a new sewer wastewater lift station. This new resort is nestled in Wine Country and located close to numerous wineries and fine dining that draw in visitors to Healdsburg every year.

Yocha Dehe Wintun Nation
Yocha Dehe Wintun Nation | Wastewater Pump Station
206 GPM | 142.9′ TDH

The Mossy Creek project is a wastewater lift station for a new development to support the Cache Creek Casino Resort.

Gulf South Pipeline
Gulf South Pipeline Company | Stormwater Pump Station
50 GPM | 15.1′ TDH

The Westlake Compressor Stormwater Pump Station in Louisiana is just one of three recent Romtec Utilities projects for the Gulf South Pipeline Company, also known as the Boardwalk Pipeline partners.

The University of California Merced
University of California | Wastewater Pump Station
720 GPM | 43.1′ TDH

Adapting to the rising numbers of students seeking a higher education, UC Merced expanded their campus, and needed a wastewater lift station to accommodate new mixed-use residence halls.

City of North Bend Logo
City of North Bend Sewer District | Wastewater Pump Station
320 GPM | 51.0′ TDH

Quadrant Homes selected Romtec Utilities to design and supply a wastewater lift station that would satisfy the both the design criteria of the district and the needs of the development.

Earthworks
Broadway Business Park | Stormwater Pump Station
50 GPM | 25.4′ TDH

In the Broadway Business Park Project, Romtec Utilities supplied a stormwater pump station for a new development by Ninety/Fifty LLC.

Industrial Crating and Packing Logo
Industrial Crating and Packing | Stormwater Lift Station
512 GPM | 29.1′ TDH

Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.

OntarioChristian
Ontario Christian High School | Wastewater Lift Station
226 GPM | 23.8′ TDH

In Ontario, California, the Ontario Christian High School was undergoing renovations. The General Contractor (GC) CCI was building a new, state of the art building that would be a dual student center and athletic facility.

takara sake
Takara Sake USA Inc. | Food-Process Pump Station
400 GPM

In the Takara Sake project, Romtec Utilities supplied an industrial food-process pump station to Takara Sake USA Inc., a Sake manufacturer based in Berkeley, California.

Net Lease Alliance 1
Net Lease Alliance | Stormwater Lift Station
200 GPM | 12.4′ TDH

NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.

HOLA Logo Resized
Heart of Los Angeles | Wastewater Lift Station
80 GPM | 20.4′ TDH

Blois Construction brought the HOLA project to Romtec Utilities to provide a wastewater lift station. Romtec Utilities, along with Blois Construction and Brandow & Johnston Engineers worked together to get the design of the station approved by LA County.

Woodburn Logo
City of Woodburn, OR | Wastewater Lift Station
424 GPM | 59.7′ TDH

Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.

Specht
Portside Phase III | Industrial Wastewater Lift Station
100 GPM | 22′ TDH

The Portside Phase 3 project was part of a new industrial development by Specht Development. Located in Vancouver, Washington, this industrial development was in need of a wastewater lift station and Perlo Construction, the awarded general contractor, brought this opportunity to Romtec Utilities.

City of Santa Paula California
City of Santa Paula | Large Wastewater Wet Well
740 GPM | 59.4′ TDH

Romtec Utilities often supplies lift stations for new developments. In the Harvest at Limoneira project, a new residential development in Santa Paula, California, was in need of a wastewater lift station with a large wet well.

Clark Regional 400X400
Clark Regional Wastewater District | Industrial Sewer Lift Station
82 GPM | 19.7′ TDH

Located at the northeastern edge of Vancouver on NE 117th Ave, this lift station will service a small industrial development as the city continues to grow and push its borders out. The Nielsen Industrial Subdivision that the sewer lift station will be serving involves roughly four acres of land for industrial construction.

Official Logo for Orange County Water Distrct
Orange County | Stormwater Lift Station
1347 GPM | 72′ TDH

This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth.

Roseburg Urban Sanitary Authority
Roseburg Urban Sanitary Authority | Meter Vault & Force Main Vault

Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.

Truckee Meadows Water Authority Logo
Truckee Meadows Water Authority | Wastewater Lift Station With Drop Bowl Assembly
76 GPM | 21′ TDH

The Mt. Rose Pump Station is a wastewater lift station in Reno, Nevada. This project was brought to Romtec Utilities by Stantec to develop the scope and configuration of the lift station. Ultimately, Romtec Utilities was used as the basis of design.

Downtown Orange County Santa Ana
The Line at Santa Ana | Stormwater Pump Stations for Mixed-Use Development
720, 600 GPM | 31′,21′ TDH

The Line at Santa Ana is a new mixed-use infill development that will add 228 new apartments and 4,000 square feet of commercial space across several buildings. Romtec Utilities was hired to provide two engineered pumping systems that would discharge treated stormwater into the storm sewer.

City of Port Orchard Washington
City of Port Orchard | Replacing Old Lift Stations With Efficient Designs
3800 GPM | 142′ TDH

The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.

bakersfield
City of Bakersfield | Wastewater Lift Station
450 GPM | 50′ TDH

Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.

Mitsubishi Gas Chemical Refining Plant
Mitsubishi Gas Chemical | Stormwater Pump Station for Chemical Refining Plant
475 GPM | 19.7′ TDH

The construction of a hydrogen peroxide refinement plant for the Mitsubishi Gas Chemical Company (MGC) required a pump station to collect and discharge stormwater to an onsite treatment system.

Port of Tacoma Washington
Port of Tacoma | Stormwater Pump Stations at Shipping Port
1090-1430 GPM | 25.6′-31.6′ TDH

The Port of Tacoma required three pump stations to send untreated stormwater through onsite water treatment systems. All stormwater that enters the marina will first travel through one of these three systems before being treated to improve the water quality at the port.

Trans Bay Cable
Trans Bay Cable | Stormwater Pump Stations for Converter Station
500 GPM | 25′ TDH

Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.

Northshore Utility District
Northshore Utility District | Wet-Dry Lift Station for Residential Development
153 GPM | 130′ TDH

Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.

lcg-400x400
Laguna Canyon Group | Stormwater Pump Station with On-Site Water Treatment
14 GPM | 22′ TDH

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.

City of Sacramento Seal
City of Sacramento | Stormwater Pump Station at Baseball Complex
930 GPM | 24.1′ TDH

Romtec Utilities designed and supplied a stormwater pump station for the new Army Depot Park in Sacramento, California. The pump station was designed for the 10-year storm and is capable of pumping 930 gallons of stormwater per minute.

HRWC-400X400
Halifax Regional Water Commission | International Wastewater Lift Station
220 GPM | 45.4′ TDH

Romtec Utilities was contacted to replace two aging wastewater lift stations with a modern system capable of handling their combined flow in Bedford Nova Scotia in Canada.

Grain Millers Wastewater and Process Fluid
Grain Millers, Inc. | Wastewater & Process Fluid Lift Station in Food Production Facility
70 GPM | 38′ TDH

Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.

Sammamish Plateau Water
Sammamish Plateau Water | Wastewater Lift Station for Residential Development
141 GPM | 185′ TDH

The construction of the Cedar Hill housing development in Sammamish, Washington required a wastewater lift station to connect new homes into the existing sewer infrastructure.

City of Shafter in California
City of Shafter | Replacement Wastewater Lift Station in City Park
414 GPM | 27.5′ TDH

Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.

calpine-energy
Russel City Energy Center | Demineralized Process Water Pumping System
1350 GPM | 15′ TDH

Romtec Utilities was contacted to help on the design of an industrial pump station that would handle demineralized process water at the Russel City Energy Center in Hayward, California.

Clark County Water Reclamation District
Clark County Water Reclamation District | Wastewater & H2S Capable Lift Station
70 GPM | 47′ TDH

Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada. Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system according to their design requirements.

Battleground Public Schools
Battleground School District | Wastewater Lift Station for School Improvement
127 GPM | 103.4′ TDH

Romtec Utilities was asked to design and supply a wastewater lift station for the Battleground School District in Southern Washington. The new pumping system was one aspect of a large facilities improvement project for the school grounds and would be owned by the school district.

City of Vancouver Washington
City of Vancouver | Wastewater Packaged Pump Station
272 GPM | 161.3′ TDH

Romtec Utilities was contacted to provide a package wastewater lift station for Columbia Palisades, a mixed-use development in Vancouver, Washington. This large development project by Airpark Development will transform 84-acres of an old rock quarry into an urban neighborhood with residential units, commercial spaces, and offices.

United Natural Foods
United Natural Foods Inc. | Combined Private and Public Sewer Lift Station
187 GPM | 32.8′ TDH

Romtec Utilities was hired to design and supply a wastewater lift station to expand the sewer infrastructure in Ridgefield, WA. The lift station was for an expansion of a commercial distribution center for United Natural Foods, Inc. or UNFI.

PSEG
Public Service Enterprise Group | Industrial Stormwater Pump Station
225 GPM | 11.7′ TDH

Romtec Utilities was contacted to design and supply a stormwater pump station as part of an improvement project at an industrial power switch station in Trenton, New Jersey.

City of Beaumont California
City of Beaumont | Wastewater Lift Station for Master Planned Community
505 GPM | 158′ TDH

Romtec Utilities designed, supplied, and manufactured a packaged wastewater lift station for a new planned community development in the City of Beaumont, California. This is a large system will meet the sewage flow requirements for 981 new homes getting constructed.

Oxnard School District
Elm Street Elementary School | Low-Flow Macerating Lift Station
70, 92 GPM | 13.3′, 8.5′ TDH

Romtec Utilities provided two wastewater lift stations for the renovation of Elm Street Elementary School in Oxnard, California. The two systems will be privately owned and maintained by the Oxnard School District.

City Living in a Rural Atmosphere
City of Norco | Sewer System Replacement Lift Stations
150, 200 GPM | 66.7′, 46.7′ TDH

Romtec Utilities designed, supplied, and manufactured two wastewater lift stations for the City of Norco, California. The sewer systems are replacing two existing lift stations to meet the growing flows in the neighborhood.

Clark Regional 400X400
Clark Regional Wastewater District | Wastewater Lift Station
392 GPM | 88.6′ TDH

Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington.

City of Lemoore California
City of Lemoore | Turnkey Sewer Lift Station
311 GPM | 16.5′ TDH

Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.

Junction City Public Works
City of Junction City | Replacement Wastewater Lift Station
335 GPM | 128′ TDH

Romtec Utilities designed and supplied a wastewater lift station and control building to replace an existing municipal sewer system in the City of Junction City, Oregon.

map-of-samoa-california
Town of Samoa | Housing Development & Fire Hydrant Booster Pump Station
1000, 200-600 GPM | 150′ TDH

Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.

Snohomish County Washington
Snohomish County | Estuary Restoration Pump Station
4170 GPM | 26.5′ TDH

Romtec Utilities designed, supplied, and manufactured a powerful stormwater pump station with an integrated control building. The pump station was installed as part of a large estuary restoration project and is used to prevent inland flooding.

Kitsap County Washington
Kitsap County | Wastewater Packaged Pump Station
130 GPM | 61.4′ TDH

Romtec Utilities was hired to provide the design and supply of a wastewater lift station for Settlers Field, a new residential development in Bremerton, Washington, across the sound from Seattle.

Georgia Transmission
Georgia Transmission Corporation | Septic Sewer System Replacement Lift Station
55 GPM | 49′ TDH

Romtec Utilities was contacted to design and supply a wastewater lift station to replace an aging septic sewer system for the Georgia Transmission Corporation’s (GTC) Electric Cooperative Training Center in Georgia.

Southgate Water and Sanitation Districts
Southgate Water District | Booster Pump Station & Integrated Control Building
125 GPM | 75′ TDH

Romtec Utilities designed and supplied a booster pump station and an integrated control building for an upscale development. This booster system regulates water pressure for the newly constructed homes.

Krueger's Tree Farms
Pacific Rim Apartments | Apartment Complex Lift Station
95 GPM | 36.3′ TDH

The construction of a new apartment complex in Warrenton, Oregon required a lift station to handle wastewater from approximately 60 new apartment units.

bakersfield
Coffee & Downing | Retail Buildings Lift Station
130 GPM | 33.2′ TDH

A private commercial development required a new lift station to handle medium flows of wastewater from several new retail buildings, including multiple restaurants.

rivers-west-development
North Bend Cottages | Stormwater Pump Station for Small Housing Development
130 GPM | 12.5′ TDH

Romtec Utilities designed and supplied a stormwater pump station for a small housing development in North Bend, Washington.

exelon-400x400
Exelon West Medway Generating Station | Power Plant Pumping Systems
30 – 70 GPM | 10′ – 35′ TDH

The expansion of the Exelon Medway Generating Station required four unique pump stations to support future operations.

Georgia Pacific Stormwater Pump Station
Georgia Pacific | Stormwater Pump Station
3100 GPM | 25′ TDH

Romtec Utilities was contacted to provide the design and supply of a stormwater pump station for the Antioch Gypsum Plant.

Department of Energy Handford Top Slab Retrofits
Department of Energy | Top Slab Retrofits

A secure Department of Energy facility in Richland, Washington required multiple top slabs to retrofit existing pump stations.

Kitsap County Washington
Kitsap County | Wastewater Lift Stations on the Manchester Shoreline
210 GPM | 34′ TDH

Romtec Utilities was contacted to design and supply three new wastewater lift stations for the Manchester residential area on the Kitsap Peninsula.

Clark Regional 400X400
Clark Regional Wastewater District | Wastewater Lift Station for Residential Development
258 GPM | 94.7′ TDH

Romtec Utilities designed and supplied a wastewater lift station for a new residential development in the City of Ridgefield, Washington. The development and lift station will be completed in phases to meet the growing flow rates of the service area.

County of Santa Barbara Seal
Santa Barbara County | Wastewater Lift Station Retrofit
60 GPM | 20′ TDH

Santa Barbara County needed to retrofit an existing lift station site to effectively replace a failing system. The lift station retrofit needed to handle medium flows of municipal sewer from two inlet lines and make use of limited site space.

Roseburg Urban Sanitary Authority
Roseburg Urban Sanitary Authority | Sewer Lift Station in Industrial Zone
197 GPM | 45.3′ TDH

Romtec Utilities was hired to design and supply a wastewater lift station for an industrial development in Roseburg, Oregon.

Orlando Utility Commission
Orlando Utility Commission | HRSG Blowdown Pump Station
100, 800 GPM | 85.6′, 135′ TDH

Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.

Pacific Gas and Electric Company
Pacific Gas & Electric Company | Wastewater Lift Station
75 GPM | 10.8′ TDH

Romtec Utilities was hired to provide the design and supply of a new wastewater lift station for Pacific Gas & Electric Company (PG & E) in Danville, California.

City of Medford Oregon
City of Medford | City Sports Park Municipal Lift Station
35 GPM | 68.5′ TDH

The City of Medford needed a new wastewater lift station to handle low flows of sewage at the new US Cellular municipal sports park.

Dow Chemical Company
DOW Chemical | Groundwater Remediation System
60 GPM | 25′ TDH

Union Carbide Corporation, a subsidiary of DOW Chemical, required a new stormwater pump station as part of a larger groundwater containment and remediation system in South Charleston, West Virginia.

Official Town Seal of the City of Puyallup
City of Puyallup | Abandoned Lift Station Retrofit
362 GPM | 40.5′ TDH

A residential development project in 2008 needed a new lift station to handle medium flows of sewage from the houses. The development was put on hold, and in 2013, Romtec Utilities supplied equipment to make the lift station operational.

cottage-health
Santa Barbara Cottage Hospital | Stormwater Pump Station
1095 GPM | 18′ TDH

A hospital in Santa Barbara, California needed an engineered pump station to handle medium flows of stormwater.

City of Stanwood
City of Stanwood | Fully Integrated Lift Station and Control Building
160 GPM | 44′ TDH

The Mineral Point housing development in the City of Stanwood, Washington required a wastewater lift station to convey sewage to treatment for newly constructed houses.

bakersfield
City of Bakersfield | Deep Sewer Lift Station
2200 GPM | 44.1′ TDH

A new residential development needed a deep well sewer lift station to handle high flows of municipal wastewater.

Port of Portland Airport Parking Structure
Portland International Airport | Parking Structure Stormwater Pump Station
3600 GPM | 46.4′ TDH

The construction of a new multi-level parking garage at the Portland International Airport (PDX) required a stormwater pump station to handle high flows of stormwater.

City of Ashland Oregon
City of Ashland, OR | Municipal Sewer Lift Station Retrofit
156 GPM | 55.7′ TDH

Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.

Washington County Groundwater Management Pump Stations
Washington County | Groundwater Management Pump Stations
38 – 52 GPM | 19.9′ – 25.2′ TDH

Seismic upgrades to the Washington County Public Service Building required the installation of five stormwater pump stations.

Peoples Self Help Housing
Mission Garden | Affordable Housing Development Lift Station
100 GPM | 29.6′ TDH

Romtec Utilities provided the design and supply of this wastewater lift station, including all structural and mechanical systems for a new affordable housing development called Mission Garden.

Sprouts
Sprouts at Mira Mesa | Low-Flow Stormwater Pump Station
54 GPM | 29′ TDH

Sprouts, a new health-focused grocery store at the Mira Mesa Mall in San Diego, California required a new stormwater pump station to handle low flows of stormwater.

Mitsubishi Chemical Carbon Fiber and Composites
Mitsubishi Manufacturing | Identical Stormwater Pump Stations
500 GPM | 15′-15.3′ TDH

A Mitsubishi manufacturing plant in Sacramento, California needed two new matching pump stations to handle low-flows of stormwater from an on-site treatment system.

City of Shafter in California
City of Shafter | Multi-Phase Residential Development
500, 1000 GPM | 27.7′, 56.8′ TDH

Gossamer Grove is the largest housing development in the City of Shafter. Romtec Utilities provided the wastewater lift station for this development after establishing a standard lift station configuration with the City on previous projects.

Sammamish Plateau Water
Sammamish Plateau Water & Sewer District | Wastewater Lift Station
110 GPM | 66.5′ TDH

Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.

download
Crystal Creek Developers, LLC | Community Stormwater Pump Station
500 GPM | 26′ TDH

A new mixed-use community development needed a stormwater pump station to handle medium flows of stormwater from the community.

city_of_cerritos
Sage Apartments | Big and Little Stormwater Pump Stations
23, 2850 GPM | 25.4′, 17.5′ TDH

Sage at Cerritos is a new luxury apartment complex in Cerritos, California, a suburb of Los Angeles. Romtec Utilities provided two stormwater pump stations for this residential development aptly referred to as “big stormwater” and “little stormwater”.

Clark Regional 400X400
Clark Regional Wastewater District | Residential Development Sewer Lift Station
330 GPM | 118′ TDH

Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.

Roseburg Urban Sanitary Authority
Roseburg Urban Sanitary Authority | Municipal Sewer Lift Station
258 GPM | 16.9′ TDH

The Roseburg Urban Sanitary Authority needed a new lift station to handle medium flows of sewage from a residential neighborhood. This precast concrete wet well is a deep well for sewer, going nearly 30 feet below grade.

Boardwalk Pipeline Partners
Boardwalk Pipeline Partners | Midstream Pipeline Stormwater Pump Station
100 GPM | 11′ TDH

The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.

Long Beach Exchange Retail
Long Beach Exchange Retail | Five Identical Stormwater Pump Stations
150 GPM | 15.9′ – 18.7′ TDH

Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.

Santa Clara Valley Transportation Authority
Santa Clara Valley Transportation Authority | Stormwater Reclamation and Filtration System
62 GPM | 36′ TDH

This stormwater pump station is part of the Santa Clara Valley Transportation Authority’s (VTA) stormwater reclamation system.

Port of Portland Airport Parking Structure
Portland International Airport | High Volume Stormwater Pump Station
18,140 GPM | 10.62′ TDH

The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.

Official Logo of Los Angeles
City of Los Angeles | Venice Dual Force Main Lift Station
200 GPM | 15′ TDH

The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.

Kings Mountain Energy Center
Kings Mountain Energy Center | HRSG Blowdown Pumping
480 GPM | 35′ TDH

A new HRSG system required 3 industrial pump stations to provide water for its processes. This HRSG blowdown pump station needed to handle extreme pumping conditions.

Douglas County Nevada
Douglas County Nevada | Residential Development
99 – 165 GPM | 224.7′ – 267′ TDH

The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.

Kitsap County Washington
Kitsap County | Wastewater Lift Stations for Residential Community
195-265 GPM | 21′-37′ TDH

Romtec Utilities provided 3 wastewater lift stations for Manchester Residential Area outside of Seattle, WA.

City of Shafter in California
City of Shafter | Sewer Lift Station Replacement
350 GPM | 19.6′ TDH

The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.

Kings Mountain Energy Center
Middletown Energy Center | HRSG Water Treatment Pump Station
40 GPM | 25′ TDH

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Naval Base Kitsap - Multiple Lift Stations
Naval Base Kitsap | Multiple Lift Stations for a High Security Base
100-1,160 GPM | 40′-130′ TDH

Romtec Utilities designed, engineered, and manufactured five unique lift stations for the Naval Base Kitsap in Washington.

Kings Mountain Energy Center
Middletown Energy Center | HRSG Blowdown and Process Pumping
480-850 GPM | 25′-35′ TDH

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

bakersfield
City of Bakersfield | Residential Wastewater Lift Station Retrofit
825 GPM | 26.1′ TDH

A residential neighborhood in Bakersfield, California needed to upgrade an existing Romtec Utilities lift station to keep up with increasing sewer flows. To meet the higher flow requirements, Romtec Utilities upgraded the existing 7.5 hp pumps to 12 HP Flygt submersible pumps in a duplex configuration.

Official Logo for Orange County Water Distrct
Orange County Water District | Sewer Lift Station Replacement
30 GPM | 30.0′ TDH

The Orange County Water District needed to replace a wastewater lift station for the Burris Basin Pump Station in Anaheim, California. Burris Basin is a large groundwater pump station, pumping clean groundwater to 19 water districts in Southern California.

Bay 101 Casino Logo
Bay 101 | Six Low-Flow Stormwater Pump Stations
31-187 GPM | 10.2′-20.6′ TDH

The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.

University of California Merced Seal
University of California Merced | Chopper Pump Sewer Lift Station
720 GPM | 48.9′ TDH

The University of California, Merced needed a new wastewater lift station for the expansion of its campus. Two 20 hp Vaughan chopper pumps were included to meet the high flow requirements.

United States Postal Service Logo
United States Postal Service | Wastewater & Stormwater Collection Lift Station
100 GPM | 29.7′ TDH

A new distribution center for the United States Postal Service in Portland, Oregon required a wastewater lift station. The lift station handles both wastewater and stormwater flows because the stormwater that is collected onsite is essentially wastewater due to fuel and other contaminants from a truck loading area.

Official Seal of the City of El Centro California
City of El Centro | Pump Station #2 Relocation
850 GPM | 30′ TDH

The City of El Centro in California needed to replace an existing lift station that had been in service for over 40 years. The new system needed to handle high flows of wastewater from the county jail and from several residential developments in the area.

Official Logo of the Victor Valley Wastewater Reclamation Authority
City of Victorville | 10th Street Lift Station
75 GPM | 23.3′ TDH

The City of Victorville needed to replace an existing lift station that had been converted to a manhole. The new lift station would handle medium flows of wastewater and pump it uphill to gravity and off to treatment.

cedar-point-sports
Cedar Point Sports Center | Lift Station Pumping into Pressure Sewer
75 GPM | 60′ TDH

Romtec Utilities provided a complete wastewater lift station for a sports park in Ohio. This lift station collects wastewater from the on-site facilities and then pumps into an existing force main.

Sammamish Plateau Water
Sammamish Plateau | Water District Prefabricated Meter Vault

An existing wastewater lift station owned by the Sammamish Plateau Water and Sewer District in Washington needed a new meter vault to track flows of sewage into an interceptor. The new meter vault was completely prefabricated by Romtec Utilities into a precast concrete vault structure, and it also includes a bypass line intended to bypass the existing lift station during maintenance and an eventual replace scheduled in upcoming years.

westfield
Westfield Valley Fair Mall | Parking Lot Stormwater Runoff Pump Station
31 GPM | 10.7′ TDH

The revitalization of a large mall in Santa Clara, CA required a new pump station to handle low flows of stormwater runoff from a section of the parking lot. This system utilized an economic design with a 4-foot ID precast concrete wet well, schedule 80 PVC discharge piping, and small ½ hp Weil pumps in a duplex configuration.

Logo for the Bureau of Reclamation
Bureau of Reclamation | Groundwater Recharge Basin
90 GPM | 20.0′ TDH

The Bureau of Reclamation needed a new wastewater lift station to handle medium flows of wastewater in Klamath Falls, Oregon. This pumping system includes 2 hp Ebara submersible pumps engineered in a duplex configuration to meet the anticipated sewage flow and provide redundancy.

Clark Regional 400X400
Clark Regional Wastewater District | Municipal Wastewater Lift Station Standard
350 GPM | 116′ TDH

A new residential development in Ridgefield, Washington needed a wastewater lift station to handle medium flows of sewage from the new houses. 23 hp Flygt submersible pumps were engineered in a duplex configuration to meet the expected peak flow rates.

PERC-Water
Pacific Grove Golf Course | Wastewater Pump Station for Effluent Recycling
230 GPM | 18.5′ TDH

The Pacific Grove Golf Course in California needed a wastewater lift station to pump medium flows of raw sewage to an effluent treatment and recycling system. This lift station was engineered with 3 hp Ebara submersible centrifugal pumps in a duplex configuration.

Eden Housing 400X400
Camphora Lift Station | Affordable Housing Apartment Complex
140 GPM | 137.6′ TDH

Romtec Utilities designed and supplied a wastewater lift station for an apartment complex in Soledad, California. This lift station pumps into an existing force main owned by the nearby Soledad Prison.

Magnolia Public Schools 400X400
Magnolia Pacific School | High Flow Stormwater Pump Station
3146 GPM | 21.3′ TDH

One aspect during the construction of Magnolia Pacific Technical School was a stormwater pump station. This system would handle extremely high flows of stormwater and pump it to treatment.

dana-point-california-400x400
Doheny Village | Simplex Stormwater Pump Station
50 GPM | 14′ TDH

City improvements for the Doheny Village in Dana Point, California required a new stormwater pump station for the residential revitalization. To meet the required flows, the new pump station utilized a 1/3 hp Goulds submersible pump in a simplex configuration.

Magnolia Public Schools 400X400
Magnolia Pacific School | Wastewater Lift Station
78 GPM | 13.7′ TDH

The construction of the Magnolia Pacific Technical School in Santa Ana, California needed a wastewater lift station to handle its sewage with medium flows of 100 gpm. To meet these flow requirements, Romtec Utilities engineered a lift station with 5 hp Weil submersible grinder pumps in a duplex configuration.

dana-point-california-400x400
Doheny Village | Duplex Wastewater Lift Station
120 GPM | 30.1′ TDH

The City of Dana Point, California wanted to improve the Doheny Village neighborhood as part of a revitalization effort. One improvement included a new wastewater lift station to handle medium sewage flows from a new condominium development.

bakersfield
Manorwood Homes | Residential Development Lift Station Retrofit
200 GPM | 27.5′ TDH

A residential development that was put on hold during the recession of the housing market needed a lift station retrofit when the development was brought back to life.

McCormick-Woods-Golf-Course
McCormick Woods | Golf Course Community Development Lift Station
100 GPM | 104.9′ TDH

In Port Orchard, Washington, new residential developments have been ongoing around the McCormick Woods Golf Course. The most recent development required a new lift station to handle medium flows of sewage for 200 new homes.

East-Bay-Municipal-District
East Bay Municipal Utility District | Water Treatment Settling Pond
2085 GPM | 118′ TDH

Refurbishing a shut-down water treatment plant required a new pump station to pump high flows of water. The unique application drains water used in a cleaning process into a large settling pond.

Port of Vancouver USA 400X400
Port of Vancouver | Port Expansion Sewer System
100 GPM | 18.4′ TDH

To accommodate new rails line and a new administration building, the Port of Vancouver needed a new lift station to handle medium flows of sewage from the new facility.

norrisandstevens
River Ridge Apartments | Apartment Complex Booster Pump Station
270 GPM | 100′ TDH

A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.

Dan-River-Steam-Station
Dan River Steam Station | Combined Cycle Blow Down Pumping
300 GPM | 20′ TDH

Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.

bae
BAE Acetic Acid Plant | Corrosive Water Pumping Skid
300 GPM | 30′ TDH

BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.

Portland International Airport
Portland Airport | New Terminal Wastewater Pumping
100 GPM | 28.19′ TDH

To accommodate a new private terminal and hanger, Portland Airport needed a new wastewater lift station to handle a medium flow of sewage from the new buildings.

City of Bremerton WA
City of Bremerton | Modern Residential Development
160 GPM | 118′ TDH

The City of Bremerton needed a new sewer lift station to handle medium flows of wastewater from a new residential development.

Salem-Hospital
Salem Hospital | Commercial Kitchen Wastewater Pumping
50 GPM | 30′ TDH

The Salem Hospital in Oregon needed a new wastewater lift station to handle medium flows of sewer and food preparation wastewater. The commercial kitchen for the hospital is located in a basement room, creating a design challenge for the kitchen.

Pomona College
Pomona College | Science Laboratory Lift Station
370 GPM | 14.5′ TDH

Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.

Sunshine-Canyon-Landfill
Sunshine Canyon Landfill | Leachate Pump Station
195 GPM | 91.4′ TDH

Republic Services, Inc. needed a new pump station to handle medium flows of wastewater in the form of treated leachate from its Sunshine Canyon Landfill.

Indian-Springs-Resort
Indian Springs Resort | Geothermal Meter Vault

The Indian Springs Resort was required to add a geothermal flow meter vault to send its used spring water to treatment at the City of Calistoga.

City of Snoqualmie
Snoqualmie Ridge Residential Development | Municipal Design Standards
115 GPM | 57.3′ TDH

A new housing development in the City of Snoqualmie needed this wastewater lift station to handle low sewage flows and meet the City’s design standards.

Indian-Springs-Resort
Indian Springs Resort | Large Stormwater System
6800 GPM | 15.7′ TDH

The Indian Springs Resort needed a new pump station designed to handle high flows of stormwater runoff from a collection storm drain.

Clark Regional 400X400
Clark Regional Wastewater District | Jessie Hollow Residential Development
124 GPM | 35′ TDH

Krippner Homes needed a new lift station to handle medium flows of sanitary sewer from a new residential development.

Indian-Springs-Resort
Indian Springs Resort | Wastewater Pumping
78 GPM | 11.6′ TDH

The Indian Springs Resort needed two new lift stations designed to pump medium flows of sanitary sewer and wastewater to municipal treatment.

Momentum 400X400
Utica East Ohio Midstream LNG Plant | Double-Wall Fiberglass Sumps
75 GPM | 67′ TDH

Utica East Ohio Midstream needed two new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, these pump stations were designed with double-wall fiberglass wet wells with interstitial leak detection.

Marathon-Logo
Marathon Petroleum | Oil Refinery Process Wastewater
75 GPM | 125′ TDH

The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater.

Momentum 400X400
Utica East Ohio Midstream LNG Plant | Double-Wall Fiberglass System
150 GPM | 59′ TDH

Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection.

IBM
IBM Resiliency Services | Data Center Wastewater Pumping
270 GPM | 36′ TDH

The IBM Boulder Data Center needed to replace a wastewater lift station with a new system to handle medium flows of wastewater generated at the facility. A precast concrete sump includes a pedestrian rated hatch with a safety grate for reliable fall protection.

City of Guadalupe California
DJ Farms | Large Residential Development
135 GPM | 36.8′ TDH

This City of Guadalupe, California needed a new wastewater lift station to accommodate a residential development for up to 800 homes.

Contech 400X400
Contech Plant | Pumping to Treatment Pond
660 GPM | 24.3′ TDH

Contech Engineered Solutions needed this pump station to pump medium flows of clean water from a Contech filtration system to a nearby treatment pond. This system was designed with 5 hp Ebara pumps in a duplex configuration.

City of Shafter in California
Gossamer Grove – Shafter, CA

The City of Shafter has worked with Romtec Utilities on many lift station projects and recommended our services to Lennar and its engineer, Quad Knopf, to provide a wastewater lift station for the Gossamer Grove development.

US Navy Logo
Lakehurst Naval Air Station | Low-Cost Sewage Lift Station
250 GPM | 24.77′ TDH

This wastewater lift station was designed to meet the standards of the Lakehurst Naval Air Station while remaining cost effective. A duplex pump configuration utilized submersible 7.5 HP Weil Slicer Pumps to handle suspended solids in the sewage.

Huntington Beach 400X400
City of Huntington Beach | Industrial Center Stormwater Pumping
1800 GPM | 28.19′ TDH

A new 144,000 square feet, two building industrial center needed a large stormwater pump station to handle the runoff from the site. This triplex system includes a fourth, “jockey” pump to handle low flow dry-season runoff.

City of San Mateo Seal
City of San Mateo | Urban Housing Development Lift Station
1218 GPM | 96′ TDH

After the historic Bay Meadows racetrack closed down, a large residential development began that required this large wastewater lift station. A triplex configuration of 30 hp Flygt pumps handles the high flow rates of this system.

Federal Law Enforcement Training Center
Federal Law Enforcement Training Center | Lift Station Replacement
40 GPM | 15′ TDH

This was a true lift station replacement by installing a new package lift station “in the hole” of the removed wet well. Submersible pumps in a duplex configuration were included to meet the low sewage flows from the federal training facility.

City of Port Orchard Washington
City of Port Orchard | Residential Development Wastewater Lift Station
200 GPM | 64′ TDH

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development.

Logo for the Pacific Convenience & Fuels
Pacific Convenience & Fuels | Grinder Pump Lift Station
15 GPM

The construction of a new gas station and convenience store required this low flow sewage lift station. Goulds submersible grinder pumps in a duplex configuration are designed to macerate and pump wastewater that contains solids or fabric materials without becoming clogged.

Elsinore Valley Municipal Water District
Elsinore Valley Municipal Water District | Oak Springs Ranch
262 GPM | 53.9′ TDH

This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing.

City of Kelso WA
City of Kelso | Submersible Wastewater Lift Station
308 GPM | 112′ TDH

A new development for a commercial park needed this wastewater lift station to connect the development to the municipal sewer system. Submersible centrifugal pumps in a duplex configuration were engineered to meet the medium flow high head conditions of the force main.

jenkinsville
V.C. Summer Nuclear Station | Industrial Grinder Pump Lift Station
35 GPM | 33.6′ TDH

This package lift station was configured to handle low flows of industrial process water used for nuclear power generation. This lift station was one of the earliest systems to be installed during the construction of two new reactors at the plant.

Granite City 400X400
Metro East Sanitary District | Municipal Sewer Lift Stations
123 GPM | 21′ TDH

A large neighborhood received these two lift stations that were designed to handle medium sewage flow requirements. The submersible solids-handling pumps in duplex configurations were specified to handle influent from three inlet lines from different sections of the neighborhood.

featured-north-college-marketplace
King Sooper’s Marketplace | Commercial Development Lift Station
150 GPM | 6.8′ TDH

The food & drug store serving a nearby university needed this replacement package wastewater lift station for medium flow rates. Submersible solids handling pumps are designed to operate with suspended grease in the water from a cafeteria in the market.

Tish-Non-Village
Bear River Band of Rohnerville Rancheria | Tribal Sewer Lift Station
70GPM | 21.6′ TDH

The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development.

City of Shafter in California
City of Shafter | Municipal Sewer Expansion Lift Station
110 GPM | 28.4′ TDH

This package lift station is part of a sustained plan to expand the collection system of a large sewage treatment plant completed in 1999. The medium flow is handled by submersible solids handling pumps in a duplex configuration.

bakersfield
New Continuation High School | Packaged Wastewater Lift Station
55 GPM | 38.5′ TDH

A new school required this low flow package lift station in order to handle the neighborhood’s increased flow of municipal wastewater. Ebara vortex pumps in a duplex configuration are used for deep well pumping.

rockmart-ga
Plantation Pipe Line | Low-Cost Stormwater Pump Station
175 GPM | 90′ TDH

This package stormwater lift station was configured to meet the medium runoff flow of this industrial property. One submersible centrifugal pump makes this a simplex station with an in-well check valve.

Sebastopol California
City of Sebastopol | Municipal Wastewater Lift Station
36 GPM | 26.8′ TDH

This package lift station was configured to meet the medium sewage flow requirements for 34 new housing units constructed by Burbank Housing Development Corporation.

The Great Seal of the Smith River Rancheria
Smith River Rancheria | Tribal Housing Wastewater Lift Station
60 GPM | 132′ TDH

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe.

battle-ground-school-district-400x400-1
Battleground School District | Septic System Replacement Lift Station
80 GPM | 28′ TDH

When a public high school decommissioned an existing septic system, a replacement package lift station was needed to handle the sewage from the campus. Tsurumi submersible cutter pumps were used to pass most solids and cut larger solids into passable sizes (about 1¼” diameter).

Untitled-1
Praxair, Inc. | Super-High Flow Industrial Lift Station
1800 GPM | 33.5′ TDH

A liquid hydrogen plant required this large 20’ deep lift station to handle super-high flows of industrial wastewater. In order to provide redundancy and expanded pumping capabilities, triplex submersible centrifugal pumps were specified in the 8’ diameter sump.

Federal Law Enforcement Training Center
Federal Law Enforcement Training Center | Lift Station Replacement
150 GPM | 30′ TDH

This replacement wastewater lift station was designed to meet the medium sewage flow requirements of this federal training facility. Submersible solids-handling pumps in a duplex configuration pumps the effluent through in-well valves and out a three-inch force main.

Vega Meadows Road Development
Vega Meadows Road Development | Fiberglass Lined Lift Station
297 GPM | 57′ TDH

Enter tagline here. I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

County of Del Norte
County of Del Norte | Municipal Sewer Lift Station
220 GPM | 36′ TDH

To extend the sewer system for Crescent City in Del Norte County, this sewage lift station was added to a new gravity line and force main. Duplex submersible chopper pumps pump the sewage to an existing gravity line and on to treatment.

City of Carpinteria CA
City of Carpinteria | Beachside Septic Replacement
87 GPM | 158.8′ TDH

An upscale beachside community in California needed this medium flow wastewater lift station to replace septic systems used at each home. To meet the requirements of the beachside location, this system includes Ameron T-Lock PVC lining on both a precast concrete sump and emergency overflow basin.

MERCK Animal Health
Merck Animal Health | Industrial Wastewater with Variable pH
100 GPM | 21′ TDH

This industrial pumping system was designed to handle medium flows of process wastewater created from cleaning cycles at the Merck Animal Health facility. The wastewater was specified with highly variable pH conditions, so the pumping system was designed with a double-wall fiberglass sump with leak detection.

Coyote-Springs-Golf-Club
Coyote Springs | Housing Development Sewer Lift Station
121 GPM | 55′ TDH

This package lift station system was designed to meet the medium sewage flows of this new residential development and private golf course. Submersible solids handling pumps in a duplex configuration manage the influent for this deep well, and an above-grade valve assembly maintains proper discharge operations.

City of Battle Ground in Washington
City of Battle Ground, Washington | Triplex Lift Station Design
3155 GPM | 46.2′ TDH

This stormwater lift station was designed for the City of Battle Ground to support the “now and future” needs of a developing area. This was achieved by designing the system to operate with large submersible pumps in a triplex configuration to meet the expected “future” flow rates.

United States Army PPS 400X400
United States Army Prime Power School | Two Distinctive Lift Stations
300 GPM | 143′ TDH

These package lift stations were designed to meet the high head pumping requirements for this training facility of the US Army Corps of Engineers. For one station with over 7,000 ft. of 8” force main, 35 hp duplex submersible centrifugal pumps were supplied to achieve the 300 gpm flow rate.

sutter-health-400x400
Sutter Medical Center | Continuous Cutter Pump Lift Station
90 GPM | 25.1′ TDH

The construction of this new hospital required a package lift station system to handle medium flows of wastewater. This comprehensive system includes five below-grade vaults. Four concrete vaults comprise the valve vault, metering vault, odor control vault, and wet well.

tennessee-valley-auth
Tennessee Valley Authority at Shawnee Fossil Plant | Industrial Sewer
50 GPM | 67.7′ TDH

This industrial power plant needed a package lift station to meet the requirements for municipal wastewater. The 23-foot-deep sump holds duplex Goulds submersible sewage pumps specified to meet the 50 gpm maximum flow requirements.

Camp Lemonnier 400X400
US Naval Base Camp Lemonnier, Djibouti | International Lift Station
100 GPM | 20′ TDH

This package lift station was the perfect solution for installing an American-made system at a US Naval Base in North Africa. The package approach facilitated transoceanic shipping and private installation.

berkeley-ca
Dona Spring Animal Shelter and Animal Services | Sewer Lift Station
75 GPM | 25′ TDH

A newly constructed public animal shelter required this package lift station to meet low sewage flows with additional animal waste. The difficulties associated with pumping animal waste required submersible solids-handling pumps in a duplex configuration.

Seattle-Parks-and-Recreation
Seattle Parks and Recreation, South Lake Union Park | Sewer Lift Station
145 GPM | 20.8′ TDH

A renovation of South Lake Union Park required a package lift station configured to meet the medium sewage flow requirements for a municipal and commercial wastewater system.

City of Oakland Municipal Wastewater
City of Oakland | Municipal Wastewater Lift Station Replacement
1339 GPM | 21.9′ TDH

This municipal water district replaced an existing lift station with this packaged lift station designed for the high sewage flow requirements. 15 hp submersible sewage pumps discharges to a below grade valve assembly, which includes valves, actuators, indicators, and access ports. The outdoor control panel utilizes a pressure transducer for primary liquid level sensing and float controls for backup. The panel also includes soft starters to reduce the inrush current, which can sap the onsite generator during pump starts.

St. Helena Napa Valley's Main Street
City of Santa Helena, California | Extended Lift Station Project
254 GPM | 49.5′ TDH

This municipal lift station in the Napa Valley was designed to handle medium sewage flows and medium head conditions. Flygt sewer pumps were supplied in a duplex configuration to integrate with the Tops Basin and discharge elbows.

Home Depot 400X400
Home Depot in Perris, California | Commercial Stormwater Pumping
900 GPM | 16′ TDH

The construction of a new Home Depot required a large detention pond and a new pump station to handle stormwater from the commercial development. This economical pump station uses 7.5hp Ebara pumps in a duplex configuration to meet the required flow rates to empty the detention pond.

city-of-wenatchee
City of Wenatchee | Wastewater Lift Station Replacement
375 GPM | 125′ TDH

This municipal lift station replacement was configured to handle medium flows of sewage from a large area of Wenatchee, Washington. This deep wet well was constructed from precast concrete and includes Tnemec interior coating.

Goodwill Logo
Goodwill | Commercial Development Lift Station
50 GPM | 14.4′ TDH

A new commercial development where a Goodwill retail store was being built needed this robust wastewater lift station. The hatch and below-grade structural components of this lift station have an H-20 rating for occasional traffic so that the system could be located in the parking lot of the development.

featured-stevens-pass
Stevens Pass Ski Resort | Fast Lift Station Retrofit
65 GPM | 35′ TDH

Romtec Utilities designed and supplied this wastewater lift station retrofit to meet the medium sewage flows at the Steven’s Pass Ski Resort. A major part of the retrofit supply package were two Vaughan submersible chopper pumps for wastewater.

Valley Fine Foods
Valley Fine Foods | Wastewater from Food Processing
45 GPM | 35′ TDH

This food processing plant in Benicia, California needed a wastewater lift station to handle combined sewage and process water from the production of pasta. The lift station design included Tsurumi grinder pumps in a duplex configuration.

California Institute for Men
California Institute for Men | Brine Wastewater Pumping Station
135 GPM | 30′ TDH

This package lift station was designed to meet the medium wastewater flows of this California prison. Solids-handling pumps in a duplex configuration are protected from cascading influent by a drop bowl.

cottage-health
Santa Barbara Cottage Hospital | Municipal Stormwater Pump Station
1095 GPM | 21.5′ TDH

This simple package lift station was designed to handle the medium flows of stormwater at this hospital facility. Submersible centrifugal pumps in a duplex configuration alternate pump starts or can both operate in high stormwater events.

Lebanon-OR
Woods Trailer & RV Park | Low Flow, Low Head Lift Station Design
72 GPM | 28′ TDH

An RV park needed this package lift station to meet the municipal sewage requirements for the residents at the park. Pumping with low flow and low head conditions, the duplex Goulds submersible pumps are sized to efficiently fit the 14’ deep, 4’ diameter wet well. An outdoor UL listed control panel utilizes floats for liquid level-sensing and includes an autodialer for communications and alarm notifications. The complete system was installed at finish grade with traffic rated hatches to provide a low profile for the residential area.

Dow Chemical Company
Dow Chemical Company | Replacement Fiberglass Lift Station
50 GPM | 90′ TDH

This package wastewater lift station replacement was delivered largely preassembled for quick and simple installation by the customer. This procedure provided an expertly designed lift station that would uphold the privacy values of the facility.

San Andreas Sanitary District California
San Andreas Sanitary District | Unique Lift Station Design
75 GPM | 28′ TDH

A new school needed this package lift station to pump stored wastewater every 24 hours. The sump was oversized by design to hold in excess of 5,000 gallons of sewage that would be pumped out at specified medium pumping rate to a low-level shutoff float control.

Pacific Gas and Electric Company
Pacific Gas and Electric Company | Industrial Stormwater and Sewer
300 GPM | 23′ TDH

These three package lift stations were designed to meet medium flows of industrial process water with added low flows of industrial stormwater and wastewater. Submersible centrifugal pumps in a duplex configuration were specified to meet the peak flows and water chemistry identified for each pump station.

Sammamish Plateau Water
Sammamish Plateau Water and Sewer District | Residential Development Lift Station
85 GPM | 75′ TDH

This medium flow sewage lift station was designed for a new development to meet the Sammamish Plateau Water and Sewer District lift station design standards. These standards specify a PLC controller with touchscreen HMI, SCADA options, a precast concrete valve vault, wet well, meter vault, and duplex submersible pumps.

UW-logo
University of Washington, Husky Stadium | Stadium Sewer Lift Station
346 GPM | 40′ TDH

The renovation of the University of Washington’s Husky Stadium required a new lift station to handle medium flows of wastewater. Robust, 10hp Vaughan Chopper pumps were used in a duplex configuration to macerate solids and to pump under unpredictable conditions.

Tesoro Oil and Water Separator Pump
Tesoro Corporation | Oil/Water Separator Stormwater Pump Station
400 GPM | 30′ TDH

A remote Tesoro Corporation industrial site needed this stormwater pump station to handle water discharged from an oil/water separator which processes on-site runoff. Submersible centrifugal pumps were used in a duplex configuration in this shallow wet well.

bear_de
Wellington Commons Development | Cutter Pump Sewer Lift Station
60 GPM | 16′ TDH

A commercial development in Delaware required this wastewater lift station to handle low flows of sewage from a new fast food restaurant and retail stores. Tsurumi cutter pumps in a duplex configuration macerate solids any in the wastewater to pass through the force main diameter.

thumbnail_union0pacific
Union Pacific Railroad | Replacement Sewer Collection System
100 GPM | 22′ TDH

The Union Pacific Depot in Cheyenne, Wyoming needed two new sewer lift stations to replace its existing sewer collection system. Each lift station included three precast concrete vault structures, a wet well, valve vault, and metering vault.

thumbnail_union0pacific
Union Pacific Railroad | Replacement Water Collection System
4000 GPM | 25′ TDH

The Union Pacific Depot in Cheyenne, Wyoming needed two new stormwater pump stations to replace existing systems. The first station used Ebara 25 hp submersible pumps in a triplex configuration to handle stormwater runoff from a parking lot and additional drains.

City of Shafter in California
City of Shafter | Existing Sewer Sump Repair
400 GPM | 28.5′ TDH

A suburb of the City of Shafter required a lift station package to repair and rehabilitate an existing wastewater sump. Duplex submersible centrifugal pumps and discharge pipe mounting brackets were fitted to a concrete slab poured in the bottom of the existing manhole.

Seal of the City of Santa Barbara
City of Santa Barbara, California | Dry-Season Stormwater Flows
275 GPM | 17′ TDH

The City of Santa Barbara needed this packaged pump station to manage low stormwater flows from events that occur during the dry season. Duplex submersible pumps capable of passing a 3-inch solid pump the water into an existing sanitary sewer pressure main and on to treatment.

City of Brawley
City of Brawley, California | Wastewater Treatment Improvements
1350 GPM | 25′ TDH

The City of Brawley needed this packaged lift station to handle high flows of wastewater at its municipal treatment plant. 12 HP submersible pumps in a duplex configuration were used to meet the high flow pumping needs and a conductive probe was used for liquid level-sensing.

International-Matex-Tank-Terminals-
International-Matex Tank Terminals | Oily Stormwater Runoff Pumping
770 GPM | 35′ TDH

An IMTT industrial storage facility needed this stormwater pump station to collect runoff and pump it to treatment onsite. The duplex submersible pumps were engineered to handle the expected medium flows of stormwater.

City of Camas Washington
City of Camas | High Head Sewer Lift Station
126 GPM | 206′ TDH

In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows.

Solyndra
Solyndra | Stormwater Runoff Pump Station
450 GPM | 35′ TDH

This new commercial complex required two new stormwater pump stations designed to meet low flows of runoff. The manholes and hatches were designed at grade to integrate seamlessly with the brick patio and walkway.

Los Angeles Trade and Technical College
Los Angeles Trade and Technical College | Stormwater Runoff Pumping
600 GPM | 26.2′ TDH

The expansion of a college campus required this stormwater pump station to handle medium flows of stormwater runoff. To meet the required pumping rate, 7.5 hp Ebara submersible centrifugal pumps were designed in a duplex configuration.

West Mesa Industrial Park
West Mesa Industrial Park | Septic System Replacement Lift Station
733 GPM | 44′ TDH

The US Army Corps of Engineers worked with Romtec Utilities to design this lift station to replace an existing septic system. The resulting package wastewater lift station met the high sewage flows of this publicly owned industrial complex.

City of Clovis New Mexico
City of Clovis, New Mexico | Municipal Sewer Expansion Lift Station
100 GPM | 15.4′ TDH

An expanding sewer system for annexed land required this packaged wastewater lift station. Duplex submersible solids handling pumps are designed to meet the medium flow requirements and pass solids up to a 2” diameter.

camp-pendleton
Marine Corps Base Camp Pendleton | Large Wet-Dry Lift Station
1585 GPM | 25′ TDH

The Marine Corps Base Camp Pendleton needed this large wet-dry wastewater lift station to replace an existing system to allow the construction of new enlisted quarters. The new lift station included triplex dry-pit pumps to handle super-high flows of sewage from the facilities.

fresheasy
Fresh & Easy Distribution Center | Commercial Wastewater Lift Station
170 GPM | 60′ TDH

The expansion of this distribution center for Fresh and Easy food products required a package lift station designed to meet medium wastewater flow requirements. This lift station for the 88-acre storage and supply facility uses an inlet line drop bowl to protect submersible solids-handling pumps in a duplex configuration from cascading influent and turbidity.

USACE-Logo
U.S. Army Corps of Engineers | Chopper Pump Sewer Lift Station
1120 GPM | 150′ TDH

This unique package wastewater lift station was designed to meet the high sewage flows of this US Army Corps of Engineers managed reservoir and nearby campgrounds. Vertical chopper pumps were engineered above the sump in a precast concrete structure with the above grade valve assembly.

Screenshot-2022-11-10-122647
Ram Power Corp. San Jacinto-Tizate Geothermal Power Plant | Lift Station
100 GPM | 24.9′ TDH

A commercially owned geothermal power facility in Nicaragua purchased this package lift station to meet its medium wastewater flows. Shipping the major components for this system required precise documentation and plans.

Los Alamos National Laboratory
Los Alamos National Laboratory | High Security Lift Station
225 GPM | 41′ TDH

A high-security federal facility purchased this package lift station to meet medium sewage flow and classified installation requirements. Installation required a 13-foot-diameter hole for the wet well to be drilled to avoid a network of buried conduit and infrastructure.

USDA-logo
USDA Forest Service | Federal Sewer Lift Station
120 GPM | 90′ TDH

The Green Ridge Campground purchased this lift station replacement that was configured to meet the medium sewage flow requirements of the site. Submersible solids handling pumps in a duplex configuration are protected from influent and turbulence by an inlet line drop bowl.

City of Camas Washington
City of Camas, Washington | High Flow Lift Station at Residential Development
415 GPM | 117′ TDH

A large residential development required this package lift station to meet the high sewage flows for over 330 residential lots. Two inlet lines are fitted with deflector panels to reduce the in-well turbidity and protect the duplex submersible solids handling pumps from cascading influent.

microsoft-logo
Microsoft Columbia Data Center | Identical Wastewater Lift Stations
120GPM | 70′ TDH

Four identical lift stations were supplied to address sewage and cooling process wastewater from this commercial facility. This was the final of four lift stations supplied to Microsoft’s 70-acre data center. Aircraft rated hatches are included for each lift station to handle heavy forklift traffic.

microsoft-logo
Microsoft Columbia Data Center | Aircraft Rated Lift Stations
120 GPM | 60′ TDH

This large commercial facility needed identical lift stations to manage wastewater in the form of sanitary sewer and discharge water from the cooling processes. This was the second of four Romtec Utilities lift stations supplied to Microsoft’s 70-acre data center.

microsoft-logo
Microsoft Columbia Data Center | Duplicate Wastewater Lift Stations
180 GPM | 40′ TDH

This package lift station was configured to meet the medium sewage flow requirements of a commercial wastewater system. This was the first of four lift stations supplied to Microsoft’s 70-acre data center.

microsoft-logo
Microsoft Columbia Data Center | Mixed Commercial Wastewater
120 GPM | 60′ TDH

To handle a combination of sewer and cooling process wastewater, this commercial facility purchased four identical Romtec Utilities package lift stations. This was the third of four lift stations supplied to Microsoft’s 70-acre data center.

City of Arcata
City of Arcata, CA | Turnkey Lift Station Replacement
2947 GPM | 34.2′ TDH

This “turnkey” replacement lift station was designed, supplied, and installed to meet super-high sewage flow with infiltration and inflow requirements of a municipal wastewater lift station.

Grand Ronde Tribal Housing Authority
Grand Ronde Tribal Housing Authority | Tribal Housing Lift Station
400 GPM | 30′ TDH

The Confederated Tribes of the Grande Ronde Community purchased this lift station to meet the medium sewage flows of a new housing development. Submersible solids handling pumps in a duplex configuration are protected from influent by two deflector panels on two inlet lines.

Laura Chenel's 400X400
Laura Chenel’s Chèvre Cheese Plant | Mixed Industrial Wastewater
90 GPM | 10.7′ TDH

This gourmet goat cheese plant needed two lift stations configured to handle medium wastewater and industrial flows from the new production plant. Submersible solids handling pumps in duplex configurations are protected from turbulence and cascading influent by an inlet line drop bowl.

County of Santa Barbara Seal
County of Santa Barbara | Replacement Sewer Lift Station
50 GPM | 28′ TDH

Santa Barbara County needed this package lift station to replace an existing system serving a residential area next to Goleta Beach. Ebara submersible sewage pumps were engineered in a duplex configuration to alternate starts and create redundancy in the system.

chobani
Chobani, Inc. | Integrated Wastewater Lift Station
83 GPM | 16′ TDH

A second lift station was added shortly after the plans for the Chobani , Inc. manufacturing facility revealed larger flows of wastewater. Similar to the first, this lift station uses two submersible centrifugal pumps to discharge effluent to a pre-treatment facility.

chobani
Chobani, Inc. | Submersible Wastewater Lift Station
20 GPM | 25′ TDH

Romtec Utilities designed this packaged wastewater lift station to meet the medium sewage flows of this giant yogurt manufacturing plant. This duplex lift station uses Ebara submersible centrifugal pumps designed for wastewater applications.

City of the Dalles Oregon
The City of the Dalles | Lift Station Design Standard Implementation
38 GPM | 28.2′ TDH

The City of the Dalles required this replacement package lift station to meet medium flows of municipal wastewater. This lift station included submersible centrifugal pumps in a duplex configuration with the ability to handle some suspended solids.

City of the Dalles Oregon
The City of the Dalles | Replacement Municipal Lift Station
132 GPM | 54′ TDH

A growing resort community with golf courses needed this Romtec Utilities package lift station to meet super high sewage flows with high head conditions. The resort has ample property for expansion and needed a wastewater lift station that would also expand.

SBA-santa-barbara-airport
Goleta Sanitary District | Comprehensive Wastewater Lift Station
1500 GPM | 66′ TDH

This lift station serves a large area and was installed at Santa Barbara Municipal Airport as part of a larger project. Two submersible solids handling pumps are supported by a jockey pump that acts as a sump pump for periods of low flow.

Basin-Electric-Power
Basin Electrical Power Cooperative | Industrial Wastewater Pumping
100 GPM | 25′ TDH

This power generation facility installed a package lift station designed for medium sewage flows of industrial wastewater. To protect the submersible solids-handling pumps, an inlet line deflector panel was included in the design.

city-of-williston
Pleasant Valley RV Park | High-Capacity Triplex Lift Station
844 GPM | 38′ TDH

A residential boom town of employees from nearby natural gas mining facilities needed a large lift station to handle over 1.2 MGD of wastewater. Submersible Ebara sewage pumps in a triplex configuration were included for the new and future pumping rates resulting from residential growth.

laguna-beach-city-seal-logo-200
City of Laguna Beach | High Profile Lift Station Replacement
600 GPM | 77′ TDH

This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package.

walmart-logo
Walmart in Gardnerville, Nevada | Stormwater Detention Pond Pumping
1300 GPM | 23.4′ TDH

A new Walmart Supercenter required this package stormwater pump station to handle runoff from its large impervious parking lot. A good sized detention basin collects the runoff water during a storm event, including from surrounding properties.

Green Sanitary District
Green Sanitary District | Low-Cost Municipal Lift Station
150 GPM | 56.8′ TDH

A large book distribution center required the local municipal agency to install this package wastewater lift station. The force main was installed via a horizontally drilled hole to the exact elevation of the wet well connection.

Correction-Corporations-of-America
Correction Corporations of America | Multiple Prison Lift Stations
836 GPM | 72′ TDH

These four package lift stations were designed to meet the high sewage flows of this commercial prison for municipal wastewater standards. Solids-handling pumps in a duplex configuration are aided by an effluent mixer designed to agitate solids inmates put into the system.

Marke
The Marke Luxury Apartments | Unique Stormwater Pumping Solution
3591 GPM | 24.8′ TDH

This stormwater pump station was designed to handle variable flows of stormwater runoff. The typical stormwater expectations called for low flow pumping, but this pump station needed to handle high flows as well.

Gas Refinery Process Water
Exxon Mobil Joint Venture Refinery | Super-High Flow Stormwater Pumping
30,000 GPM | Various TDH

To address the industrial stormwater concerns of coastal Louisiana, this large, precast concrete pump station was designed to meet super-high flows of runoff at this Exxon refinery.

British-Petroleum-Cherry-Point-Refinery
British Petroleum Cherry Point Refinery | Industrial Stormwater Runoff
350GPM | 30′ TDH

This package lift station handles the medium flows of stormwater and process water drainage at this oil refinery. A stormwater plan is required at most industrial facilities and BP proactively chose a reliable lift station to manage its environmental footprint.

suncadia
Suncadia Resort | Super-High Flow, High Head Lift Station
800 GPM | 175′ TDH

A growing resort community with golf courses needed this Romtec Utilities package lift station to meet super high sewage flows with high head conditions. The resort has ample property for expansion and needed a wastewater lift station that would also expand.

Dow Chemical Company
Dow Chemical Company Louisiana Operations | Prefabricated Pump Station
8500 GPM | 32′ TDH

This package pump station was designed to respect the confidentiality of this industrial facility. The entire system was delivered with much of the hardware preinstalled in the fiberglass wet well to facilitate simple, “drop-in” installation.

Laughlin
Laughlin Colorado River Heritage Greenway | Grinder Pump Lift Stations
45 GPM | 66′ TDH

A publicly funded greenway project required two package lift stations that were configured to meet the low flow, high head requirements for this park. Grinder pumps in duplex configurations will alternate between starts to reduce wear on the pumps and make time of operation equal.

Sacramento Municipal Utility District
Sacramento Municipal Utility District | Deep Well Sewer Lift Station
172 GPM | 94′ TDH

The newly constructed headquarters for the Sacramento Municipal Utility District purchased this package lift station to meet its medium sewage flow requirements. Submersible solids-handling pumps in a duplex configuration were specified in a deep well because this facility represents one of the ten largest public utilities in the country.

FedPrisonsLogo
Milan Federal Correctional Institute | Low-Cost Lift Station Retrofit
125 GPM | 22′ TDH

Two skid-mounted lift station systems retrofitted two existing stations for medium sewage flows at this federal correctional facility. Preassembled above-grade skids with Pioneer self-priming pumps in duplex configurations drop suction piping into the existing sumps to pump effluent to the existing force mains.

Untitled-1
Praxair Hydrogen Refinery | Self-Priming Pumping Skid
540 GPM | 280′ TDH

This packaged pump station was the second of two pump stations supplied for industrial process water and stormwater at two Valero oil refineries. The design criteria specified varying flows which required a duplex pump configuration with an included “jockey” pump to handle the smaller flows.

Untitled-1
Praxair Hydrogen Refinery | Mixed Industrial Water Pump Station
562GPM | 200′ TDH

This was the first of two packaged pump stations needed to handle varying flows of industrial process water and stormwater at a hydrogen refinery. Submersible centrifugal pumps in a duplex configuration also included a submersible “jockey” pump.

Basin-Electric-Power
Basin Electric Power Cooperative | Clean Water Industrial Pumping
130 GPM | 45′ TDH

The Groton Generating Station needed this package lift station to pump clean water as a part of its power generating processes from natural gas. The submersible centrifugal pumps in a duplex configuration meet the pumping requirements for this facility and discharge the water to parallel force mains.

Oxy 2
Occidental Petroleum at Elk Hills, Inc. | Industrial Water Reuse
200 GPM | 115′ TDH

This package pump station was configured to meet the medium flow requirements for this clean water power generation process and reuse system. The system has a large precast-concrete rectangular sump with a barrier wall –or weir wall- to reduce turbulence for the pumps.

kauai coffee
McBryde Resources | Continuous High Flow, High Head Pumping
9600 GPM | 415′ TDH

To create new potable water, this lift station pumps clean stormwater from a collection/storage basin to a treatment facility. Duplex vertical turbine pumps move high flows of water very efficiently and use soft starters to reduce torque on the vertical shaft and provide additional pump diagnostics.

Official Logo for Orange County Water Distrct
Orange County Groundwater Replenishment System | Collection Pump Station
4500 GPM | 32.5′ TDH

To create new potable water, this lift station pumps clean stormwater from a collection/storage basin to a treatment facility. Duplex vertical turbine pumps move high flows of water very efficiently and use soft starters to reduce torque on the vertical shaft and provide additional pump diagnostics.

Sacramento Municipal Utility District
Sacramento Municipal Utility District | High Flow Stormwater Pumping
8496 GPM | 43′ TDH

The new headquarters for the Sacramento Municipal Utility District needed this package pump station to handle high flows of stormwater.

CSUCI
California State University Channel Islands | Stormwater Pump Station
2500 GPM | 25′ TDH

A university needed this package stormwater pump station designed to meet the high flow requirements for draining a detention pond. A flooded inlet line from the detention pond is pumped by submersible centrifugal pumps in a duplex configuration.

Burton School District - Municipal Wastewater Lift Station
Burton School District | Municipal Wastewater Lift Station
38 GPM | 41′ TDH

This package wastewater lift station was designed to meet the low sewage flow requirements of a municipal lift station for developing an elementary school site. The duplex pump configuration with submersible grinder pumps and a drop bowl provides reliable and lasting pumping capabilities.

USDA-logo
USDA Fire District | Low-Flow Sewage Lift Station
50 GPM | 70′ TDH

This lift station was designed to meet the low sewage flow requirements of a municipal lift station that would also serve new construction and commercial buildings.

Clark Regional 400X400
Clark County Regional Wastewater District | Wastewater Lift Station
198 GPM | 51′ TDH

This package lift station was designed to meet municipal standards for medium sewage flows at this new commercial complex. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station.

US Army, Fort Lewis, Washington
US Army, Fort Lewis, Washington | Industrial Water Lift Station
100 GPM | 10′ TDH

This package lift station in Fort Lewis was configured to meet the medium flow requirements for a federal industrial process system with stormwater to treatment. Submersible centrifugal pumps are protected from turbulence by a drop bowl.

City of Salinas California
City of Salinas, CA | Residential Development Wastewater Lift Station
50 GPM | 17.4′ TDH

This lift station was designed to meet the low sewage flow requirements of a municipal lift station for a new residential development. The duplex pump configuration, solids-handling pumps, and inlet-line drop bowl provide suitable preventative measures for a reliable and long-term wastewater lift station.

Honolulu-hawaii
Aliamanu Military Reserve, Hawaii | Lift Station
74 GPM | 85′ TDH

Serving the US Army Base, Fort Shafter, this military neighborhood needed a lift station replacement package to be installed adjacent to the existing lift station. The Army and Romtec Utilities configured this submersible centrifugal pump station to pump the medium flow of municipal wastewater.

texas-association-of-counties
Ajax Gas Plant | Industrial Stormwater and Process Water
200 GPM | 50′ TDH

This package pump station was designed to meet a low flow of industrial process water with added low flows of industrial stormwater. The dual purposes of this pump station required shaft-driven centrifugal pumps with the motors located above-grade.

u-of-o
University of Oregon School of Journalism and Communication | Stormwater Pump Station
350 GPM | 25′ TDH

This package pump station was designed to meet low flows of stormwater expected after the expansion of this university building. The duplex pump configuration with submersible centrifugal pumps provides reliable and lasting pumping capabilities.

This is the seal for the U.S. Department of Energy
U.S. Department of Energy, Hanford, Washington | Package Lift Station
180 GPM | 20′ TDH

This package lift station was designed to meet the medium sewage flow requirements of an industrial and commercial lift station. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station.

Clark Regional 400X400
Clark County Regional Water District | Municipal Sewer Lift Station
325 GPM | 48′ TDH

This lift station was designed to meet the medium sewage flow requirements of a municipal lift station. The duplex pump configuration and backup level sensing provide suitable redundancy for a reliable and long-term wastewater lift station.

Navajo Tribal Utility Authority
Navajo Tribal Utility Authority | Turnkey Lift Station Replacement
58 GPM | 97′ TDH

This National Park Service lift station replacement was a “turnkey” project designed to meet commercial, municipal, and Navajo EPA standards for medium sewage flows. The design included chopper pumps in a duplex configuration, an inlet-line drop bowl, and a separate below-grade valve assembly.